My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 111 7-09.3(25) Mechanical Joint Restraining Devices <br /> (******) <br /> Restrain joints at bends, tees, dead ends and connections to existing water mains as <br /> shown on the Plans using mechanical joint restraining devices. <br /> Install joint restraint system in accordance with the manufacturer's recommendations. <br /> ' 7-09.4 Measurement <br /> Delete all paragraphs of 7-09.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-09.5 Payment <br /> Delete all paragraphs of 7-09.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B - Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-12 VALVES FOR WATER MAINS <br /> 7-12.1 Description <br /> Supplement 7-12.1 as follows: <br /> ' 7-12.1(1) Submittals <br /> (******) <br /> Provide Type 2 Working Drawings for all materials and Standard Plans. <br /> ' 7-12.2 Materials <br /> Delete the first paragraph in 7-12.2 and substitute the following <br /> Provide materials meeting the requirements of the following: <br /> ' Gate Valves (2-inches to 12-inches) <br /> 9-30.3(1) Special Provisions <br /> Butterfly Valves 9 30.3(3) Special Provisions <br /> Valve Boxes 9-30.3(4) Special Provisions <br /> Valve Stem Extensions <br /> 9-30.3(6) Special Provisions <br /> Combination Air ReleaseNacuum Valve <br /> 9-30.3(7) Special Provisions <br /> Tapping Sleeve and Valve 9-30.3(8) Special Provisions <br /> Assembly <br /> 7-12.3 Construction Requirements <br /> Supplement 7-12.3 by adding the following: <br /> Install valve box centered on the operator nut. <br /> Provide 3-inch thick x 2-feet x 2-feet HMA concrete pad around valve boxes located <br /> within gravel surface. <br /> Provide one valve stem extension, minimum 12-inch length, in accordance with COE <br /> Standard Drawing No. 505 when the top of the valve operating nut is more than three <br /> feet below finished grade. <br /> ' Provide equipment, labor, tools, materials and miscellaneous parts to perform <br /> pavement sawing, pavement removal, excavations, shoring, traffic control and other <br /> Work required to prepare the site for City Utility Department personnel to install the <br /> City supplied tapping sleeve and valve assembly. <br /> Notify City Utility Department a minimum of five business days for each tap being <br /> made. The Utility Department will determine the date and time to make each tap. <br /> Water Main Replacement"Q" Division 7-STORM,SEWER,WATER February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No.-UP3612 SP-157 <br />
The URL can be used to link to this page
Your browser does not support the video tag.