My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> The unit contract price for Water Fire Service, 6-Inch, shall constitute full compensation for <br /> all labor, materials, tools and equipment necessary for new 6-inch ductile iron service lines <br /> from the tee on the new main to reconnecting with the existing service line, including yet <br /> not limited to, reducers; pipe installation; 6-inch heavy duty gate valve and box; restrained <br /> joint fittings; trench excavation, backfill and compaction; street pavement, concrete curb, <br /> concrete curb and gutter, concrete driveway and concrete sidewalk removal; clearing and <br /> grubbing; testing; lawn restoration including seeding or sodding; connection to existing <br /> service line including fittings and new pipe matching existing diameter and material; <br /> dewatering; and removal or abandonment of existing service connection. <br /> Bid Item 30 - Temporary Pavement Patch <br /> Measurement and Payment: Unit Price per Square Yard (SY) <br /> Measurement for Temporary Pavement Patch shall be by the square yard placed within the <br /> sawcut neatlines limits of dimensions defined in the Work, descriptions for other bid items, <br /> shown on the Plans, or COE Standard Drawings, or as otherwise approved by the <br /> Engineer. <br /> The unit price per square yard for Temporary Pavement Patch in accordance with Standard <br /> Specifications, 5-06.3(6) of these Special Provisions and as shown on the Plans shall be <br /> full compensation for all work necessary to complete Temporary Pavement Patch in <br /> accordance with these specifications. <br /> Regardless of duration or sequence of work, this item will be measured and paid one time. <br /> Bid Item 31 - Crushed Surfacing Top Course I <br /> Measurement and Payment: Unit Price per Ton (TON) <br /> Measurement for crushed surfacing top course will be by the ton as recorded on certified <br /> weight tickets in accordance with 1-09.2 WEIGHING EQUIPMENT and limited to <br /> dimensions defined in the Work, descriptions for other bid items, shown on the Plans, <br /> details or COE Standard Drawings or as otherwise approved by the Engineer. Crushed <br /> Surfacing Top Course material placed exceeding "neatline" quantities without advance <br /> authorization by the Inspector will not be paid for. <br /> The unit price per ton shall be full compensation for all labor, compaction, material, tools, <br /> and equipment necessary to furnish, haul, stockpile, place, grade, and compact imported <br /> crushed surfacing top course for the Work as required, from a Contractor supplied source in <br /> accordance with the Standard Specifications and these Special Provisions. <br /> The unit price for crushed surfacing top course also includes all costs for controlling <br /> moisture content. <br /> Also included in this bid item shall be the cost of all equipment required to remove existing <br /> soils to attain proper elevations, compaction of native subgrade soils, as well as to <br /> uniformly spread and compact the crushed surfacing material. <br /> The unit price for this bid item includes all costs for removing, loading and disposing of <br /> displaced unsuitable material, including haul. I <br /> Include in this bid item the cost of sprinkling during dry periods prior to placement of the <br /> crushed surfacing and while spreading and compacting the material. <br /> Payment for crushed surfacing top course will be by the ton of material placed and <br /> approved by the Inspector. <br /> Bid Item 32 - Cement Concrete Pavement Base Type III (H.E.S.) for Trench Patch <br /> Measurement and Payment: Unit Price per Square Yard (SY) <br /> Water Main Replacement"Q" Division B—BID DESCRIPTIONS February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No.—UP3612 SP-10 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.