SRV Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
SRV Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2020 12:24:08 PM
Creation date
5/3/2018 9:23:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
SRV Construction Company
Approval Date
5/1/2018
Council Approval Date
4/11/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement Q Evergreen Way
Public Works WO Number
UP3612
Tracking Number
0001180
Total Compensation
$1,450,524.96
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
SRV CONSTRUCTION 4/11/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
SRV Construction 4/16/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Expose the water main being hot tapped, including properly shoring the excavation in <br /> accordance with requirements of WISHA, RCW 49.17 including WAC 296-155. Should <br /> City personnel determine the excavation and shoring do not meet the requirements of <br /> WISHA, RCW 49.17, including WAC 296-155, City personnel will notify Contractor to <br /> make necessary modifications to bring the excavation and shoring into compliance <br /> prior to City personnel entering the trench. <br /> Once the conditions are deemed safe for City personnel to enter the trench, City will <br /> install the tapping sleeve and valve assembly and Utility Department personnel will <br /> perform the hot tapping of the existing main. . Upon City Utility Department personnel <br /> completing installing and testing the tapping sleeve and valve assembly. City Utility <br /> Department personnel will connect to Contractor's installed pipe upon Contractor's <br /> successful completion and testing of Contractor installed water main. Backfill, compact, <br /> and restore the area. <br /> Where shown on the Plans, adjust existing valve boxes and covers to the grade as <br /> staked or otherwise designated by the Engineer. Using riser rings to adjust the valve <br /> box to grade is not allowed. <br /> Conduct removal operations conducted to prevent damage to the valve boxes. <br /> Replace parts or materials damaged due to the Contractor's operations at his expense. <br /> Conduct valve box adjustments so the final adjusted valve box allows full operation of <br /> the valve. Remove debris from the adjusted valve boxes to ensure full valve operation. <br /> Delete the third sentence of the first paragraph in 7-12.3(1) and substitute the following: <br /> Where shown on the Plans, provide valve marker post with the exposed portion having <br /> the letter V and the distance in feet to the valve stenciled in black paint on the post. <br /> Provide a two inch high stencil to produce the letters and numerals. <br /> 7-12.4 Measurement <br /> Delete all paragraphs of 7-12.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-12.5 Payment <br /> Delete all paragraphs of 7-12.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-14 HYDRANTS <br /> 7-14.1 Description , <br /> Supplement 7-14.1 as follows: <br /> 7-14.1(1) Submittals <br /> Provide Type 2 Working Drawings for all materials and Standard Plans. <br /> 7-14.2 Materials <br /> Delete the material list in 7-14.2 and substitute the following: <br /> Provide materials meeting the requirements of the following: <br /> Hydrants 9-30.5 Special Provisions , <br /> Water Main Replacement"Q" Division 7—STORM,SEWER,WATER February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No.—UP3612 SP—158 , <br />