Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> 7-14.3 Construction Requirements <br /> ' 7-14.3(1) Setting Hydrants <br /> Delete the first and second paragraphs in 7-14.3(1) and substitute the following: <br /> Provide fire hydrant assemblies in accordance with City of Everett Standard <br /> Drawing No. 507 and 508. <br /> Revise the first sentence of the fourth paragraph to read as follows: <br /> Paint hydrants in accordance with Part L in COE Standard Drawing No. 507. <br /> Supplement 7-14.3(1) as follows: <br /> Consider a hydrant in service when it is installed in working order in accordance <br /> with the Plans and Specifications. <br /> 7-14.3(2) Hydrant Connections <br /> Delete the first paragraph in 7-14.3(2) and substitute the following: <br /> Provide continuous 6-inch diameter ductile iron pipe from the auxiliary gate valve <br /> ' at the main to the hydrant in accordance with COE Standard Drawing 507. <br /> Provide mechanical joint restraining glands conforming to 9-30.2(6) of these <br /> Special Provisions. <br /> 7-14.3(2)A Hydrant Restraints <br /> Revise the first paragraph in 7-14.3(2)A to read as follows: <br /> ' Restrain thrust created in short hydrant laterals of one pipe length or less <br /> using mechanical retainer glands at the auxiliary valve and hydrant fittings as <br /> shown in the COE Standard Drawing No. 507. For longer hydrant leads <br /> requiring two or more pipe lengths, Contractor may use field lock gaskets in <br /> ' lieu of mechanical joint restraint system to restrain the number of pipe joints <br /> between the auxiliary valve and the hydrant. <br /> 7-14.3(2)B Auxiliary Gate Valves and Valve Boxes <br /> Revise the first paragraph in 7-14.3(2)B to read as follows: <br /> Provide auxiliary gate valves and valve boxes in accordance with Section 7- <br /> 12 and COE Standard Drawing No. 507. <br /> 1 7-14.4 Measurement <br /> Delete all paragraphs of 7-14.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B - Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-14.5 Payment <br /> Delete all paragraphs of 7-14.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> ' as described in Division B - Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-15 SERVICE CONNECTIONS <br /> 7-15.1 Description <br /> Delete the first paragraph of 7-15.1 and substitute the following: <br /> ' This Work consists of installing residential and commercial service connections from <br /> the main to the private line for the premises served. Include the meter box and meter <br /> setter for existing non-metered services. Include replacing existing meter boxes and <br /> meter setters as noted on the Plans and as directed by the Engineer. <br /> ' Water Main Replacement"Q" Division 7-STORM, SEWER,WATER February 9, 2018 <br /> -Evergreen Way Rebid <br /> ' WO No.-UP3612 SP-159 <br />