I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Bid Item 36 - Permanent Pavement Marking <br /> Measurement and Payment: Lump Sum (LS) <br /> This lump sum bid item includes all costs associated with furnishing all labor, materials, and <br /> other equipment necessary for restoring and replacing permanent traffic marking, including <br /> and not limited to, stop bars, turn arrows, lettering, crosswalks, reflectors, delineators, and <br /> lane or fog-line striping removed or damaged by the Contractor's work in accordance with <br /> the COE Standard Drawing No. 720, Special Provisions and Plans. <br /> Bid Item 37 - Portable Changeable Message Signs <br /> Measurement and Payment: Unit Price per Hour (HR) <br /> Measurement shall be will be measured by the hour for the time that each sign is operating <br /> as shown on an approved Traffic Control Plan. <br /> The unit price, when applied to the number of units measured for this item, shall be full <br /> compensation for all costs of labor, materials and equipment incurred by the Contractor in <br /> procuring and operating all portable changeable message signs required for the project and I <br /> for transporting these signs to and from the project. <br /> Bid Item 38 - Vehicle Loop Detectors <br /> Measure and Payment: Unit Price per Linear Foot (LF) <br /> Measurement for "Vehicle Loop Detectors", for both loop perimeter and home run, shall be <br /> by linear foot of neat line sawcut. <br /> The unit price per linear foot shall include saw cutting, cleaning, and drying of pavement, <br /> installing loops and home runs, loop wire, sealant, splice kit, and splicing between loop wire <br /> and lead-on cable, any work necessary to access a junction box, and testing of the vehicle <br /> detectors as defined in Section 8-20.3(14)D. <br /> SCHEDULE B — DRAINAGE <br /> Bid Item 39 - Storm Drainage Structure Removal/Pipe Replacement <br /> Measurement and Payment: Unit Price per Each (EA) <br /> 111 <br /> The unit contract price for Storm Drainage Structure Removal/Pipe Replacement shall <br /> constitute full compensation for all labor, materials, tools and equipment necessary and <br /> incidentals to remove existing structure, including and not limited to, dewatering; <br /> excavation, removal, hauling and disposal of existing concrete catch basin structure and <br /> existing concrete pipe; removal, hauling, and disposal of excess excavated materials; <br /> salvaging existing casting, providing and installing new storm drain pipe and connecting to <br /> existing pipe in accordance with Detail 4, Sheet 11; providing, compacting, and testing <br /> bedding and backfill materials; cleanup; and any additional work, materials, and equipment <br /> required to complete the Work as specified; except, as included in other unit price bids. <br /> Bid Item 40 - Storm Drainage Structure Removal/Tee Replacement <br /> Measurement and Payment: Unit Price per Each (EA) <br /> The unit contract price for Storm Drainage Structure Removal/Tee Replacement shall <br /> constitute full compensation for all labor, materials, tools and equipment necessary and <br /> incidental to remove existing structure, including but not limited to, dewatering; excavation, <br /> removal, hauling and disposal of existing concrete catch basin structure and existing <br /> concrete pipe; removal, hauling, and disposal of excess excavated materials; salvaging <br /> existing casting, providing and installing new storm drain pipe and tee and connecting to <br /> Water Main Replacement"Q" Division B—BID DESCRIPTIONS February 9, 2018 <br /> -Evergreen Way Rebid <br /> WO No.—UP3612 SP-12 <br /> I <br />