<br /> CITY OF EVERETT SPECIAL PROVISIONS
<br /> Bid Item 36 - Permanent Pavement Marking
<br /> Measurement and Payment: Lump Sum (LS)
<br /> This lump sum bid item includes all costs associated with furnishing all labor, materials, and
<br /> other equipment necessary for restoring and replacing permanent traffic marking, including
<br /> and not limited to, stop bars, turn arrows, lettering, crosswalks, reflectors, delineators, and
<br /> lane or fog-line striping removed or damaged by the Contractor's work in accordance with
<br /> the COE Standard Drawing No. 720, Special Provisions and Plans.
<br /> Bid Item 37 - Portable Changeable Message Signs
<br /> Measurement and Payment: Unit Price per Hour (HR)
<br /> Measurement shall be will be measured by the hour for the time that each sign is operating
<br /> as shown on an approved Traffic Control Plan.
<br /> The unit price, when applied to the number of units measured for this item, shall be full
<br /> compensation for all costs of labor, materials and equipment incurred by the Contractor in
<br /> procuring and operating all portable changeable message signs required for the project and I
<br /> for transporting these signs to and from the project.
<br /> Bid Item 38 - Vehicle Loop Detectors
<br /> Measure and Payment: Unit Price per Linear Foot (LF)
<br /> Measurement for "Vehicle Loop Detectors", for both loop perimeter and home run, shall be
<br /> by linear foot of neat line sawcut.
<br /> The unit price per linear foot shall include saw cutting, cleaning, and drying of pavement,
<br /> installing loops and home runs, loop wire, sealant, splice kit, and splicing between loop wire
<br /> and lead-on cable, any work necessary to access a junction box, and testing of the vehicle
<br /> detectors as defined in Section 8-20.3(14)D.
<br /> SCHEDULE B — DRAINAGE
<br /> Bid Item 39 - Storm Drainage Structure Removal/Pipe Replacement
<br /> Measurement and Payment: Unit Price per Each (EA)
<br /> 111
<br /> The unit contract price for Storm Drainage Structure Removal/Pipe Replacement shall
<br /> constitute full compensation for all labor, materials, tools and equipment necessary and
<br /> incidentals to remove existing structure, including and not limited to, dewatering;
<br /> excavation, removal, hauling and disposal of existing concrete catch basin structure and
<br /> existing concrete pipe; removal, hauling, and disposal of excess excavated materials;
<br /> salvaging existing casting, providing and installing new storm drain pipe and connecting to
<br /> existing pipe in accordance with Detail 4, Sheet 11; providing, compacting, and testing
<br /> bedding and backfill materials; cleanup; and any additional work, materials, and equipment
<br /> required to complete the Work as specified; except, as included in other unit price bids.
<br /> Bid Item 40 - Storm Drainage Structure Removal/Tee Replacement
<br /> Measurement and Payment: Unit Price per Each (EA)
<br /> The unit contract price for Storm Drainage Structure Removal/Tee Replacement shall
<br /> constitute full compensation for all labor, materials, tools and equipment necessary and
<br /> incidental to remove existing structure, including but not limited to, dewatering; excavation,
<br /> removal, hauling and disposal of existing concrete catch basin structure and existing
<br /> concrete pipe; removal, hauling, and disposal of excess excavated materials; salvaging
<br /> existing casting, providing and installing new storm drain pipe and tee and connecting to