My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2018 10:05:06 AM
Creation date
5/3/2018 10:03:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/1/2018
Council Approval Date
4/18/2018
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hot Mix Asphalt Overlay 2018 Project
Public Works WO Number
PW3667
Tracking Number
0001181
Total Compensation
$3,252,113.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
111 <br /> 1 permanent. All calculations, surveying, and measuring required for setting <br /> 2 and maintaining the necessary lines shall be the Contractor's responsibility. <br /> I 3 <br /> 4 Preliminary spotting shall be provided at a spacing of 40 foot maximum on <br /> 5 tangents and 25 foot maximum on curves and tapers. All curves, tapers, stop <br /> 1 6 lines, and crosswalks shall be laid out with a rope. Field layout for curves and <br /> 7 tapers shall use an 800' minimum length rope. The color of the material used <br /> 8 for preliminary spotting shall be white. Longitudinal marking shall be parallel <br /> I 9 with the proposed line applied with a paint marker wand or other approved <br /> 10 method, a minimum of 6 inches in length and wide enough so that a minimum <br /> 11 of two marks can be clearly seen at night under ordinary headlight conditions. <br /> I 12 Refreshing of marks prior to striping shall be the responsibility of the <br /> 13 Contractor. <br /> 14 <br /> I 15 Striping layout shall be performed by, or under the direct supervision of, <br /> 16 personnel certified by IMSA as a Signs and Marking Specialist Level I or <br /> 17 higher. Personnel performing the field layout and preliminary spotting shall be <br /> 18 proficient in the practice of striping layout, including layout and preliminary <br /> I19 spotting of curves and tapers using a rope and paint wand, proper annotation <br /> 20 on the pavement of starts, stops, and changes in line type for pavement <br /> 21 markings, and an understanding of WSDOT Standard Plans and City Standard <br /> 1 22 Drawings for pavement markings. <br /> 23 <br /> 24 Survey personnel performing the calculations, notes, and layout data shall be <br /> I 25 on site to answer questions regarding the layout notes as the roadway is being <br /> 26 spotted or shall perform the work. In the event a revision is required by the <br /> 27 Contracting Agency during field layout, either to correct errors in the notes or to <br /> I 28 make minor revision noted in the ordinary progress of the work, field layout <br /> 29 shall be performed by the Contractor at the time. <br /> 30 <br /> I 31 All field layout shall be completed during the same shift as the striping is <br /> 32 obliterated by grinding or paving unless otherwise directed by the Engineer. <br /> 33 Any striping revisions directed by the Contracting Agency at the time of <br /> 34 preliminary spotting shall be documented in the striping notes and submitted to <br /> I35 the Contracting Agency. Any revisions requested to the field layout following <br /> 36 approval will be the responsibility of the Contracting Agency. <br /> 37 <br /> I 38 Permanent pavement marking shall not begin until the layout is approved by <br /> 39 the Contracting Agency. Such approval shall not relieve the Contractor of <br /> 40 responsibility for the accuracy of the field markings. <br /> I 41 <br /> 42 Payment <br /> 43 <br /> I 44 Payment will be made in accordance with Section 1-04.1 for the following bid <br /> 45 item when included in the proposal: <br /> 46 <br /> I <br /> 47 "Roadway Surveying", lump sum. <br /> 48 <br /> 49 The lump sum contract price for "Roadway Surveying" shall be full pay for all <br /> 50 labor, equipment, materials, and supervision utilized to perform the Work <br /> I 51 specified for layout and preliminary spotting of pavement markings, both <br /> 52 temporary and permanent, including any resurveying, checking, correction of <br /> 53 errors, replacement of missing or damaged markings, and coordination efforts. <br /> 1 54 <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 53 OF 57 March 6,2018 <br /> I WORK ORDER#3667 <br /> SPECIAL PROVISIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.