My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2018 10:05:06 AM
Creation date
5/3/2018 10:03:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/1/2018
Council Approval Date
4/18/2018
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hot Mix Asphalt Overlay 2018 Project
Public Works WO Number
PW3667
Tracking Number
0001181
Total Compensation
$3,252,113.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 8-22.3(2) Preparation of Roadway Surfaces <br /> 2 <br /> 3 Section 8-22.3(2) is supplemented with the following: <br /> 4 <br /> 5 <br /> 6 Apply materials to new HMA that is sufficiently cured according to the <br /> 7 manufacturer's recommendation. Permanent paint marking material applied to new <br /> 8 HMA require a pavement cure period of at least 21 days. Permanent Type D <br /> 9 marking material applied to new HMA require a pavement cure period of at least 10 <br /> 10 days. <br /> 11 <br /> 12 8-22.4 Measurement <br /> 13 <br /> 14 Section 8-22.4 is supplemented read as follows: <br /> 15 <br /> 1 <br /> 16 (******) <br /> 17 The measurement of crosswalk line and stop line will be based on the linear foot of 24" <br /> 18 wide marking installed. <br /> 19 <br /> 20 The measurement of aerial survey marker and access parking space symbol will be per <br /> 21 each for each marker installed. <br /> 22 <br /> 23 8-22.5 Payment <br /> 24 <br /> 25 Section 8-22.5 is supplemented read as follows: <br /> 26 <br /> 27 (******) <br /> 28 "24" Plastic Crosswalk Line", per Linear Foot. <br /> 29 <br /> 30 "24" Plastic Stop Line", per Linear Foot. <br /> 31 <br /> 32 <br /> 33 CNH 8-23.DOCX <br /> 34 8-23 TEMPORARY PAVEMENT MARKINGS <br /> 35 <br /> 36 8-23.2 Materials <br /> 37 <br /> 38 Section 8-23.2 is supplemented read as follows: <br /> 39 <br /> 40 (.,....) <br /> 41 Materials for temporary markings shall be paint or reflectorized aluminum tape, as <br /> 42 directed by the Engineer and selected from approved materials listed in the Qualified <br /> 43 Products List. <br /> 44 <br /> 45 Temporary paint shall be used on subsurface pavements and may be paved over. <br /> 46 Should sudden inclement weather create a pavement too wet to install temporary paint, <br /> 47 temporary flexible raised pavement markers shall be installed on 40' intervals as <br /> 48 directed by the Engineer. Temporary flexible raised pavement markers shall be selected <br /> 49 from approved materials listed in the Qualified Products List. Temporary flexible raised <br /> 50 pavement markers shall be nailed to the subsurface pavement and removed prior to <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 54 OF 57 March 6,2018 <br /> WORK ORDER#3667 <br /> SPECIAL PROVISIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.