My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2018 10:05:06 AM
Creation date
5/3/2018 10:03:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/1/2018
Council Approval Date
4/18/2018
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hot Mix Asphalt Overlay 2018 Project
Public Works WO Number
PW3667
Tracking Number
0001181
Total Compensation
$3,252,113.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I1 paving. Reflectorized aluminum tape shall be used on new pavement and removed <br /> 2 during permanent marking application. <br /> 1 3 <br /> 4 8-23.5 Payment <br /> 5 <br /> 1 6 Section 8-23.5 is supplemented read as follows: <br /> 7 <br /> 8 (.....) <br /> I 9 Temporary Pavement Marking will be paid for under bid item "Temporary Pavement <br /> 10 Markings" per linear foot. This shall be full pay for constructing, maintaining, and <br /> 11 removing temporary lines and markers as specified. No additional compensation will be <br /> I 12 allowed when Contractor is required to repair temporary markings that have been <br /> 13 damaged or worn. <br /> 14 <br /> I 15 <br /> 16 GKK 8-26.DOCX <br /> 17 8-26 RESOLVE ABOVE GROUND CONFLICTS <br /> III <br /> 18 (******) <br /> 19 <br /> 20 Section 8-26 is vacant and is replaced with the following: <br /> I 21 <br /> 22 8-26.1 Description <br /> 23 <br /> I 24 This work consists of resolving unanticipated above ground conflicts to conform to the <br /> 25 Project requirements due to construction, where they are not addressed by the <br /> 26 Construction Plans and Details. This bid item may be used to construct or modify items <br /> I 27 which are not identified, nor addressed in the Plans and Details. <br /> 28 <br /> 29 8-26.2 Vacant <br /> I 30 <br /> 31 8-26.3 Construction Requirements <br /> 32 <br /> I 33 As directed by Engineer, address and resolve underground conflicts that need <br /> 34 modification to accommodate construction. <br /> 35 <br /> 36 8-26.4 Vacant <br /> I37 <br /> 38 8-26.5 Payment <br /> 39 <br /> 1 40 "Resolved unanticipated conflicts" Force Account, as provided in Section 1-09.6. <br /> 41 <br /> 42 To provide a common Proposal for all Bidders, the Contracting Agency has entered an <br /> I 43 amount in the Proposal to become a part of the Contractor's total Bid. <br /> 44 <br /> 45 <br /> I 46 CNH 8-27.DOCX <br /> 47 8-27 UNIFORMED POLICE OFFICER <br /> 48 <br /> I 49 Section 8-27 is vacant and is replaced with the following: <br /> 50 <br /> I <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 55 OF 57 March 6, 2018 <br /> I WORK ORDER#3667 <br /> SPECIAL PROVISIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.