My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2018 10:05:06 AM
Creation date
5/3/2018 10:03:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/1/2018
Council Approval Date
4/18/2018
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hot Mix Asphalt Overlay 2018 Project
Public Works WO Number
PW3667
Tracking Number
0001181
Total Compensation
$3,252,113.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 The water shall be discharged to a stabilized conveyance, sediment trap, stormwater <br /> i <br /> 2 pond, rock splash pad, or vegetated strip, in a manner to prevent erosion and maintain <br /> 3 water quality compliance. <br /> 4 <br /> 5 The last paragraph is deleted. <br /> 6 <br /> 7 8-01.3(15) Maintenance <br /> 8 This section is revised to read: <br /> 9 <br /> 10 Erosion and sediment control BMPs shall be maintained or adaptively managed as <br /> 11 required by the CSWGP until the Engineer determines they are no longer needed. <br /> 12 When deficiencies in functional performance are identified, the deficiencies shall be <br /> 13 rectified immediately. <br /> 14 <br /> 15 The BMPs shall be inspected on the schedule outlined in Section 8-01.3(1)B for <br /> 16 damage and sediment deposits. Damage to or undercutting of BMPs shall be repaired <br /> 17 immediately. <br /> 18 <br /> 19 In areas where the Contractor's activities have compromised the erosion control <br /> 20 functions of the existing grasses, the Contractor shall overseed at no additional cost to <br /> 21 the Contracting Agency. <br /> 22 <br /> 23 The quarry spalls of construction entrances shall be refreshed, replaced, or screened to <br /> 24 maintain voids between the spalls for collecting mud and dirt. <br /> 25 <br /> 26 Unless otherwise specified, when the depth of accumulated sediment and <br /> 27 debris reaches approximately '/3 the height of the BMP the deposits shall be removed. <br /> 28 Debris or contaminated sediment shall be disposed of in accordance with Section 2- <br /> 29 03.3(7)C. Clean sediments may be stabilized on-site using BMPs as allowed by the <br /> 30 Engineer. <br /> 31 <br /> 32 8-01.3(16) Removal <br /> 33 This section is revised to read: <br /> 34 <br /> 35 The Contractor shall remove all temporary BMPs, all associated hardware and <br /> 36 associated accumulated sediment deposition from the project limits prior to Physical <br /> 37 Completion unless otherwise allowed by the Engineer. When the temporary BMP <br /> 38 materials are made of natural plant fibers unaltered by synthetic materials the Engineer <br /> 39 may allow leaving the BMP in place. <br /> 40 <br /> 41 The Contractor shall remove BMPs and associated hardware in a way that minimizes I <br /> 42 soil disturbance. The Contractor shall permanently stabilize all bare and disturbed soil <br /> 43 after removal of BMPs. If the installation and use of the erosion control BMPs have <br /> 44 compacted or otherwise rendered the soil inhospitable to plant growth, such as <br /> 45 construction entrances, the Contractor shall take measures to rehabilitate the soil to <br /> 46 facilitate plant growth. This may include, but is not limited to, ripping the soil, <br /> 47 incorporating soil amendments, or seeding with the specified seed. <br /> 48 <br /> 49 At the request of the Contractor and at the sole discretion of the Engineer the CSWGP <br /> 50 may be transferred back to the Contracting Agency. Approval of the Transfer of <br /> 51 Coverage request will require the following: <br /> 52 <br /> 53 1. All other Work required for Contract Completion has been completed. <br /> 54 <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 32 OF 53 March 6,2018 <br /> WORK ORDER#3667 <br /> AMENDMENTS TO STANDARD PROVISIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.