My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2018 10:05:06 AM
Creation date
5/3/2018 10:03:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/1/2018
Council Approval Date
4/18/2018
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hot Mix Asphalt Overlay 2018 Project
Public Works WO Number
PW3667
Tracking Number
0001181
Total Compensation
$3,252,113.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I1 2. All Work required for compliance with the CSWGP has been completed to the <br /> 2 maximum extent possible. This includes removal of BMPs that are no longer <br /> 1 <br /> 3 needed and the site has undergone all Stabilization identified for meeting the <br /> 4 requirements of Final Stabilization in the CSWGP. <br /> 5 <br /> I 6 3. An Equitable Adjustment change order for the cost of Work that has not been <br /> 7 completed by the Contractor. <br /> 8 <br /> I 9 4. Submittal of the Washington State Department of Ecology Transfer of <br /> 10 Coverage form (Ecology form ECY 020-87a) to the Engineer. <br /> 11 <br /> I 12 If the Engineer approves the transfer of coverage back to the Contracting Agency, the <br /> 13 requirement in Section 1-07.5(3) for the Contractor's submittal of the Notice of <br /> 14 Termination form to the Washington State Department of Ecology will not apply. <br /> 15 <br /> I16 8-01.4 Measurement <br /> 17 This section's content is deleted and replaced with the following new subsections: <br /> 18 <br /> I 19 8-01.4(1) Lump Sum Bid for Project (No Unit Items) <br /> 20 When the Bid Proposal contains the item "Erosion Control and Water Pollution <br /> 21 Prevention" there will be no measurement of unit or force account items for Work <br /> 1 22 defined in Section 8-01 except as described in Sections 8-01.4(3) and 8-01.4(4). Also, <br /> 23 except as described in Section 8-01.4(3), all of Sections 8-01.4(2) and 8-01.5(2) are <br /> 24 deleted. <br /> I 25 <br /> 26 8-01.4(2) Item Bids <br /> 27 When the Proposal does not contain the items "Erosion Control and Water Pollution <br /> I 28 Prevention", Section 8-01.4(1) and 8-01.5(1) are deleted and the Bid Proposal will <br /> 29 contain some or all of the following items measured as noted. <br /> 30 <br /> I 31 ESC lead will be measured per day for each day that an inspection is made and a <br /> 32 report is filed. <br /> 33 <br /> I <br /> 34 <br /> 35 Biodegradable erosion control blanket and plastic covering will be measured by the <br /> square yard along the ground slope line of surface area covered and accepted. <br /> 36 <br /> 37 Turbidity curtains will be measured by the linear foot along the ground line of the <br /> I 38 installed curtain. <br /> 39 <br /> 40 Check dams will be measured per linear foot one time only along the ground line of <br /> I <br /> 41 <br /> 42 the completed check dam. No additional measurement will be made for check <br /> dams that are required to be rehabilitated or replaced due to wear. <br /> 43 <br /> I 44 Stabilized construction entrances will be measured by the square yard by ground <br /> 45 slope measurement for each entrance constructed. <br /> 46 <br /> I 47 Tire wash facilities will be measured per each for each tire wash installed. <br /> 48 <br /> 49 Street cleaning will be measured by the hour for the actual time spent cleaning <br /> I 50 pavement, refilling with water, dumping and transport to and from cleaning locations <br /> 51 within the project limits, as authorized by the Engineer. Time to mobilize the <br /> 52 equipment to or from the project limits on which street cleaning is required will not <br /> 53 be measured. <br /> I54 <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 33 OF 53 March 6, 2018 <br /> I WORK ORDER#3667 <br /> AMENDMENTS TO STANDARD PROVISIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.