My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2018 10:05:06 AM
Creation date
5/3/2018 10:03:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/1/2018
Council Approval Date
4/18/2018
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hot Mix Asphalt Overlay 2018 Project
Public Works WO Number
PW3667
Tracking Number
0001181
Total Compensation
$3,252,113.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Inletprotections <br /> will be measured per each for each initial installation at a <br /> 2 drainage structure. <br /> 3 <br /> 4 Silt fence, gravel filter, compost berms, and wood chip berms will be measured by <br /> 5 the linear foot along the ground line of the completed barrier. <br /> 6 <br /> 7 Wattles and compost socks will be measured by the linear foot. <br /> 8 <br /> 9 Temporary curbs will be measured by the linear foot along the ground line of the <br /> 10 completed installation. <br /> 11 <br /> 12 Temporary pipe slope drains will be measured by the linear foot along the flow line <br /> 13 of the pipe. <br /> 14 <br /> 15 Coir logs will be measured by the linear foot along the ground line of the completed <br /> 16 installation. <br /> 17 <br /> 18 Outlet protections will be measured per each initial installation at an outlet location. <br /> 19 <br /> 20 Tackifiers will be measure by the acre by ground slope measurement. <br /> 21 <br /> 22 8-01.4(3) Reinstating Unit Items with Lump Sum Erosion Control and <br /> 23 Water Pollution Prevention <br /> 24 The Contract Provisions may establish the project as lump sum, in accordance with <br /> 25 Section 8-01.4(1) and also include one or more of the items included above in Section <br /> 26 8-01.4(2). When that occurs, the corresponding measurement provision in Section 8- <br /> 27 01.4(2) is not deleted and the Work under that item will be measured as specified. <br /> 28 <br /> 29 8-01.4(4) Items not included with Lump Sum Erosion Control and Water <br /> 30 Pollution Prevention <br /> 31 Compost blanket will be measured by the square yard by ground slope surface area <br /> 32 covered and accepted. <br /> 33 <br /> 34 Mulching will be measured by the acre by ground slope surface area covered and <br /> 35 accepted. <br /> 36 <br /> 37 Seeding, fertilizing, liming, mulching, and mowing, will be measured by the acre by <br /> 38 ground slope measurement. <br /> 39 <br /> 40 Seeding and fertilizing by hand will be measured by the square yard by ground slope <br /> 41 measurement. No adjustment in area size will be made for the vegetation free zone <br /> 42 around each plant. <br /> 43 <br /> 44 Fencing will be measured by the linear foot along the ground line of the completed <br /> 45 fence. <br /> 46 <br /> 47 8-01.5 Payment <br /> 48 This section's content is deleted and replaced with the following new subsections: <br /> 49 <br /> 50 8-01.5(1) Lump Sum Bid for Project (No Unit Items) <br /> 51 Payment will be made for the following Bid item when it is included in the Proposal: <br /> 52 <br /> 53 "Erosion Control and Water Pollution Prevention", lump sum. <br /> 54 <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 34 OF 53 March 6,2018 <br /> WORK ORDER#3667 <br /> AMENDMENTS TO STANDARD PROVISIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.