My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/1/2018
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/1/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2018 10:05:06 AM
Creation date
5/3/2018 10:03:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/1/2018
Council Approval Date
4/18/2018
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Hot Mix Asphalt Overlay 2018 Project
Public Works WO Number
PW3667
Tracking Number
0001181
Total Compensation
$3,252,113.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 "Coir Log", per linear foot. <br /> 2 <br /> 3 "Temporary Curb", per linear foot. <br /> 4 <br /> 5 "Temporary Pipe Slope Drain", per linear foot. <br /> 6 <br /> 7 "Temporary Seeding", per acre. <br /> 8 <br /> 9 "Outlet Protection", per each. <br /> 10 <br /> 11 "Tackifier", per acre. <br /> 12 11113 "Erosion/Water Pollution Control", by force account as provided in Section 1-09.6. <br /> 14 <br /> 15 Maintenance and removal of erosion and water pollution control devices including <br /> 16 removal and disposal of sediment, stabilization and rehabilitation of soil disturbed <br /> 17 by these activities, and any additional Work deemed necessary by the Engineer to <br /> 18 control erosion and water pollution will be paid by force account in accordance with <br /> 19 Section 1-09.6. <br /> 20 <br /> 21 To provide a common Proposal for all Bidders, the Contracting Agency has entered an <br /> 22 amount in the Proposal to become a part of the Contractor's total Bid. <br /> 23 <br /> 24 8-01.5(3) Reinstating Unit Items with Lump Sum Erosion Control and <br /> 25 Water Pollution Prevention <br /> 111 <br /> 26 The Contract may establish the project as lump sum, in accordance with Section 8- <br /> 27 01.4(1) and also reinstate the measurement of one or more of the items described in <br /> 28 Section 8-01.4(2), except for Erosion/Water Pollution Control, by force account. When <br /> 29 that occurs, the corresponding payment provision in Section 8-01.5(2) is not deleted <br /> 30 and the Work under that item will be paid as specified. <br /> 31 <br /> 32 8-01.5(4) Items not included with Lump Sum Erosion Control and Water <br /> 33 Pollution Prevention <br /> 34 Payment will be made for each of the following Bid items when they are included in the <br /> 35 Proposal: <br /> 36 <br /> 37 "Compost Blanket", per square yard. <br /> 38111 <br /> 39 "Mulching", per acre <br /> 40 <br /> 41 "Mulching with PAM", per acre , <br /> 42 <br /> 43 "Mulching with Short-Term Mulch", per acre. <br /> 44 <br /> 45 "Mulching with Moderate-Term Mulch", per acre. <br /> 46 <br /> 47 "Mulching with Long-Term Mulch", per acre. <br /> 48 <br /> 49 "Seeding, Fertilizing and Mulching", per acre. <br /> 50 <br /> 51 "Seeding and Fertilizing", per acre. <br /> 52 <br /> 53 "Seeding and Fertilizing by Hand", per square yard. <br /> 54 <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 36 OF 53 March 6,2018 <br /> WORK ORDER#3667 <br /> AMENDMENTS TO STANDARD PROVISIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.