Laserfiche WebLink
1 "Second Application of Fertilizer", per acre. <br /> 2 <br /> 3 "Liming", per acre. <br /> 4 <br /> 5 "Mowing", per acre. <br /> 6 <br /> 7 "Seeding and Mulching", per acre. <br /> 8 <br /> I 9 "High Visibility Fence", per linear foot. <br /> 10 <br /> 11 8-09.AP8 <br /> ' 12 Section 8-09, Raised Pavement Markers <br /> 13 January 3, 2017 <br /> 14 8-09.5 Payment <br /> 15 In the last paragraph, "flaggers and spotters" is revised to read "flaggers". <br /> 16 <br /> 17 8-10.AP8 <br /> 18 Section 8-10, Guide Posts <br /> 19 January 4, 2016 <br /> ' 20 8-10.3 Construction Requirements <br /> 21 The last sentence of the second paragraph is deleted. <br /> 22 <br /> ' 23 8-11.AP8 <br /> 24 Section 8-11, Guardrail <br /> 25 January 17, 2017 <br /> ' 26 8-11.3(1)C Terminal and Anchor Installation <br /> 27 This section is supplemented with the following new paragraph: <br /> 28 <br /> 29 Beam Guardrail Non-flared Terminals for Type 1 guardrail shall meet the crash test and <br /> 30 evaluation criteria of NCHRP 350 or the Manual for Assessing Safety Hardware <br /> ' 31 <br /> 32 (MASH). Beam Guardrail Non-flared Terminals for Type 31 guardrail shall meet the <br /> crash test and evaluation criteria of MASH. <br /> 33 <br /> 34 8-11.3(1)F Removing and Resetting Beam Guardrail <br /> 35 The last sentence of the first paragraph is deleted. <br /> 36 <br /> 37 8-11.5 Payment <br /> 38 The paragraph following the Bid item "Removing and Resetting Beam Guardrail", per linear <br /> 39 foot is revised to read: <br /> 40 <br /> 41 The unit Contract price per linear foot for "Removing and Resetting Beam Guardrail" <br /> 42 shall be full payment for all costs to perform the Work as described in Section 8- <br /> 43 11.3(1)F, except for replacement posts and blocks. <br /> 44 <br /> 45 The paragraph following the Bid item "Raising Existing Beam Guardrail", per linear foot is <br /> 46 revised to read: <br /> ' 47 <br /> 48 The unit Contract price per linear foot for "Raising Existing Beam Guardrail" shall be full <br /> 49 payment for all costs to perform the Work as described in Section 8-11.3(1)E, except for <br /> 50 replacement posts and blocks. <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 37 OF 53 March 6,2018 <br /> WORK ORDER#3667 <br /> AMENDMENTS TO STANDARD PROVISIONS <br />