Laserfiche WebLink
I1 For all cement concrete pavement and areas that will not be overlaid with hot mix <br /> 2 asphalt or BST, grinding is allowed to a depth just above the pavement surface and then <br /> I 3 Water blasting or shot blasting shall be required to remove the remaining pavement <br /> 4 markings. <br /> 5 <br /> I 6 If in the opinion of the Engineer, the pavement is materially damaged by pavement <br /> 7 marking removal, such damage shall be repaired by the Contractor in accordance with <br /> 8 Section 1-07.13(1). Sand or other material deposited on the pavement as a result of <br /> I 9 removing lines and markings shall be removed as the Work progresses to avoid <br /> 10 hazardous conditions. Accumulation of sand or other material which might interfere with <br /> 11 drainage will not be permitted. <br /> I 12 <br /> 13 8-22.4 Measurement <br /> 14 The first two sentences of the fourth paragraph are revised to read: <br /> I 15 <br /> 16 The measurement for "Painted Wide Lane Line", "Plastic Wide Lane Line", "Profiled <br /> 17 Plastic Wide Lane Line", "Painted Barrier Center Line", "Plastic Barrier Center Line", <br /> 18 "Painted Stop Line", "Plastic Stop Line", "Painted Wide Dotted Entry Line", or "Plastic <br /> I 19 Wide Dotted Entry Line" will be based on the total length of each painted, plastic or <br /> 20 profiled plastic line installed. No deduction will be made for the unmarked area when the <br /> 21 marking includes a broken line such as, wide broken lane line, drop lane line, wide <br /> I 22 dotted lane line or wide dotted entry line. <br /> 23 <br /> 24 8-22.5 Payment <br /> I 25 The following two new Bid items are inserted after the Bid item "Plastic Crosshatch Marking", <br /> 26 per linear foot: <br /> 27 <br /> I <br /> 28 "Painted Wide Dotted Entry Line", per linear foot. <br /> 29 <br /> 30 "Plastic Wide Dotted Entry Line", per linear foot. <br /> I 31 <br /> 32 9-01.AP9 <br /> 33 Section 9-01, Portland Cement <br /> I34 August 7, 2017 <br /> 35 This section's title is revised to read: <br /> 36 <br /> I37 Cement <br /> 38 <br /> 39 9-01.1 Types of Cement <br /> I 40 This section is revised to read: <br /> 41 <br /> 42 Cement shall be classified as portland cement, blended hydraulic cement, or rapid <br /> I <br /> 43 hardening hydraulic cement. <br /> 44 <br /> 45 9-01.2(2) Vacant <br /> I 46 This section, including title, is revised to read: <br /> 47 <br /> 48 9-01.2(2) Rapid Hardening Hydraulic Cement <br /> I <br /> 49 Rapid hardening hydraulic cement shall meet the requirements of ASTM C 1600. <br /> 50 <br /> 51 9-01.2(3) Low Alkali Cement <br /> I52 This section is renumbered as follows: <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 39 OF 53 March 6,2018 <br /> I WORK ORDER#3667 <br /> AMENDMENTS TO STANDARD PROVISIONS <br />