Laserfiche WebLink
1 GLF 2-02.3 3 B.DOCX <br /> 2 2-02.3(3)B Temporary Asphalt Concrete Sidewalk <br /> 33 (--) <br /> 5 Temporary asphalt concrete sidewalk shall be placed by the end of each shift <br /> 6 after finishing connections to the junction boxes. <br /> 7 <br /> 8 Temporary asphalt concrete sidewalk shall be constructed of Commercial HMA <br /> 9 as specified in Section 5-04. The HMA will have a dense, uniform surface and I <br /> 10 will fully retain its shape, grade, and shall be free of tripping hazards after <br /> 11 placement. <br /> 12 I 13 Temporary asphalt concrete sidewalk shall be included in the bid item <br /> 14 "Removing Sidewalk". <br /> 15 <br /> 16 <br /> 17 2-02.4.GR2 <br /> 18 Measurement <br /> 19 <br /> 20 2-02.4.INSTI.GR2 <br /> 21 Section 2-02.4 is supplemented with the following: <br /> 22 <br /> 23 CNH 2-02.4.OPT3.DOCX <br /> 24 (******) <br /> 25 Sidewalk removal will be measured by the square yard. The unit contract price shall be <br /> 26 full pay as described in this Section for removing sidewalk where shown in the Plans, <br /> 27 including sawcutting up to 6" in depth, removal of concrete panels entirely, restoration of I <br /> 28 native vegetation disturbed by the operation, placement of temporary asphalt concrete <br /> 29 sidewak, and all other Work necessary for the removal of sidewalk panels and disposal <br /> 30 of materials from the site. <br /> 31 <br /> 32 <br /> 33 2-02.5.GR2 <br /> 34 Payment <br /> 35 <br /> 36 2-02.5.INST2.GR2 <br /> 37 Section 2-02.5 is supplemented with the following: <br /> 38 <br /> 39 CNH 2-02.5.OPT16.DOCX <br /> 40 (******) <br /> 41 "Removing Sidewalk", per square yard. <br /> 42 <br /> 43 GLF 2-08.DOCX <br /> 44 2-08 STREET CLEANING <br /> 45 (******) <br /> 46 <br /> 47 Section 2-08 of the standard specifications is vacant shall be replaced by the following: <br /> 48 <br /> HOT MIX ASPHALT OVERLAY-2018 PAGE 36 OF 57 March 6,2018 <br /> WORK ORDER#3667 111SPECIAL PROVISIONS <br />