My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Thomco Construction 5/2/2018
>
Contracts
>
Capital Contract
>
Thomco Construction 5/2/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2019 9:00:42 AM
Creation date
5/3/2018 10:40:48 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Thomco Construction
Approval Date
5/2/2018
Council Approval Date
4/4/2018
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
North Wetmore Stormwater Separation
Public Works WO Number
UP3659
Tracking Number
0001182
Total Compensation
$3,395,788.65
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
THOMCO CONSTRUCTION 7/15/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> The unit price for each inlet and catch basin shall also include, but not be limited to, all <br /> costs for excavation; hauling and disposing of surplus or unsuitable material; dewatering; <br /> storm water flow bypassing, furnishing and installing couplings; furnishing and installing111 <br /> steps or ladder; placing and compacting of suitable native backfill; furnishing, placing, and <br /> compacting foundation material as required; cleaning and flushing catch basins; <br /> reconnecting existing storm drainage connections; furnishing and installing gas traps; and 1 <br /> replacing; protecting, and maintaining utilities. <br /> All costs associated with abandoning, and/or removing and disposing of existing catch <br /> basins and inlets, salvaging frame and grate or cover, as shown on the plans shall be <br /> included in the unit price for this bid item. <br /> Adjusting new catch basin inlets to final grade is incidental and shall be included in the unit <br /> price for this bid item. <br /> The cost of connection of pipes to the inlet or catch basin is incidental and shall be included <br /> in the unit price for this bid item. <br /> Measurement and payment shall be per each catch basin inlet installed as measured upon <br /> completion. <br /> Bid Item 34 - Catch Basin, Type 2, 48-inch DIA, Additional Height <br /> Measurement and Payment: Unit Price per Linear Foot <br /> In addition to the measurement per each, catch basin type 2 in excess of 10 feet in height <br /> will be measured per linear foot for each additional foot of total height over 10 feet as <br /> measured from the flow line to the surface of the Work. <br /> The unit price per linear foot shall be full compensation for all labor, material, tools and <br /> equipment necessary to satisfactorily complete the Work as defined in these Contract <br /> Documents. <br /> Measurement of catch basin height for payment purposes shall be the distance from the <br /> flowline of the outlet pipe to the surface of the Work measured to the nearest foot. <br /> Bid Item 35 - Water Quality Treatment Structure <br /> Measurement and Payment: Unit Price per Each I <br /> The unit price per each water quality treatment structure shall be full compensation for all <br /> labor, material, incidentals, tools and equipment necessary to satisfactorily complete the <br /> work as defined in these Contract Documents. <br /> The unit price for each water quality treatment structure shall be full compensation for <br /> furnishing, hauling, and assembling in place the completed installation. <br /> The unit price for each water quality structure shall also include, but not be limited to, <br /> manufacturer's services as required in the plans and special provisions. <br /> The unit price for each water quality treatment structure shall also include, but not be <br /> limited to, all costs for excavation; hauling and disposing of surplus or unsuitable material; <br /> dewatering; furnishing and installing couplings; placing and compacting native backfill; <br /> furnishing, placing, and compacting foundation material as required; cleaning and flushing <br /> water quality treatment structure; and replacing; protecting, and maintaining utilities. <br /> Adjusting new water quality treatment structure to final grade is incidental and shall be <br /> included in the unit price for this bid item. <br /> The cost of connection of pipes to the water quality treatment structure is incidental and <br /> shall be included in the unit price for this bid item. <br /> North Wetmore Stormwater Separation February, 2018 <br /> WO No—UP3659 Division B—BID ITEM DESCRIPTIONS <br /> SP-10 , <br />
The URL can be used to link to this page
Your browser does not support the video tag.