Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> 111 <br /> Measurement and payment shall be per each water quality treatment structure installed as <br /> measured upon completion. <br /> Bid Item 36 - Bypass Structure, 60-inch DIA <br /> Measurement and Payment: Unit Price per Each <br /> The unit price per each bypass structure shall be full compensation for all labor, material, <br /> incidentals, tools and equipment necessary to satisfactorily complete the work as defined in <br /> these Contract Documents. <br /> The unit price for each bypass structure shall be full compensation for furnishing, hauling, <br /> and assembling in place the completed installation including catch basins, frames and <br /> covers, pipe connections, weir wall, steel reinforcement, baffles, baffle supports, and <br /> associated hardware, special fittings, and joint materials. <br /> The unit price for each bypass structure shall also include, but not be limited to, all costs for <br /> excavation; hauling and disposing of surplus or unsuitable material; dewatering; furnishing <br /> and installing catch basin structure, furnishing and installing couplings; furnishing and <br /> installing steps or ladder; furnishing and installing weir wall and baffle, placing and <br /> compacting native backfill; furnishing, placing, and compacting foundation material as <br /> required; cleaning and flushing structure; and replacing; protecting, and maintaining <br /> utilities. <br /> Adjusting new bypass structure to final grade is incidental and shall be included in the unit <br /> price for this bid item. <br /> The cost of connection of pipes to the bypass structure is incidental and shall be included in <br /> the unit price for this bid item. <br /> Measurement and payment shall be per each bypass structure installed as measured upon <br /> completion. <br /> Bid Item 37 - Bypass Structure, 72-inch DIA <br /> Measurement and Payment: Unit Price per Each <br /> The unit price per each bypass structure shall be full compensation for all labor, material, <br /> ' incidentals, tools and equipment necessary to satisfactorily complete the work as defined in <br /> these Contract Documents. <br /> The unit price for each bypass structure shall be full compensation for furnishing, hauling, <br /> and assembling in place the completed installation including catch basins, frames and <br /> covers, pipe connections, weir wall, steel reinforcement, baffles, baffle supports, and <br /> associated hardware, special fittings, and joint materials. <br /> The unit price for each bypass structure shall also include, but not be limited to, all costs for <br /> excavation; hauling and disposing of surplus or unsuitable material; dewatering; furnishing <br /> and installing catch basin structure, furnishing and installing couplings; furnishing and <br /> installing steps or ladder; furnishing and installing weir wall and baffle, placing and <br /> compacting native backfill; furnishing, placing, and compacting foundation material as <br /> required; cleaning and flushing structure; and replacing; protecting, and maintaining <br /> utilities. <br /> Adjusting new bypass structure to final grade is incidental and shall be included in the unit <br /> price for this bid item. <br /> The cost of connection of pipes to the bypass structure is incidental and shall be included in <br /> the unit price for this bid item. <br /> North Wetmore Stormwater Separation February, 2018 <br /> WO No-UP3659 Division B-BID ITEM DESCRIPTIONS <br /> ' SP-11 <br />