Laserfiche WebLink
Project: Sewer Regulators R4 & R39 Modifications <br /> Change Order No.1 <br /> Change Order Effective Date: February 26, 2018 <br /> Bid Item#12—Type 1 Manhole,60-inch Diameter. Delete one Type 1 Manhole, 60-inch Diameter <br /> in the amount of$19,536.95 per each, resulting in a($19,536.95) contract price decrease. <br /> Bid Item #24—Temporary Sewer Flow Bypassing at R4 site. Delete this lump sum bid item from <br /> the contract in the amount of$59,266.41, resulting in a ($59,266.41)contract price decrease. <br /> Bid Item #26—Gravel Borrow. Modify existing bid item#26 entitled"Gravel Borrow", by adding <br /> 1,100.00 tons of gravel borrow at the unit price of$41.95/ton, resulting in a $46,145.00 contract price <br /> increase. <br /> Bid Item #29—Landscaping & Irrigation Restoration @ R4 Site. Delete this lump sum bid item <br /> from the contract in the amount of$15,635.79, resulting in a($15,635.79) contract price decrease. <br /> Bid Item #35—Force Account. The original dollar amount allotted for this bid item was $75,000.00, <br /> to be used at the discretion of the Engineer. This change order is written to increase this $75,000.00, <br /> by an additional $30,000.00 to a dollar value of$105,000.00. <br /> The net result of adding four(4) new items and making modifications to seven (7) existing bid items of <br /> the contract, results in a contract price increase of$60,149.47 <br /> JUSTIFICATION: <br /> Bid Item#7—Removal of Structures and Obstructions <br /> Bid Item#9—Sheeting, Shoring,Bracing and Noise Wall Protection at R4 Site <br /> Bid Item #12—Type 1 Manhole,60-inch Diameter <br /> Bid Item#24—Temporary Sewer Flow Bypassing at R4 site <br /> Item#37 -Removal of Structures and Obstructions Revised <br /> Item #38—Revised Sheeting, Shoring, Bracing and Noise Wall Protection at R4 Site <br /> Item#39—Revised Temporary Sewer Flow Bypassing at R4 site <br /> The justification for the above four(4) existing bid items and three (3) new items involves the <br /> following change made to the Contract. <br /> The contract plan sheet No. 10 called for the installation of a new 60-inch diameter Type 1 manhole, <br /> (called out as MH#3), to be installed just east of the existing regulator structure at the R4 site. The <br /> existing regulator structure was, per Contract, to be completely removed and have a new section of 48- <br /> inch diameter pipe installed in that location. Inspection of the existing regulator structure revealed that <br /> it was structurally sound and there was no need to remove it completely. The base of the existing <br /> regulator structure was left intact and sections of the new 60-inch diameter Type 1, manhole #3 were <br /> shifted to the west and installed onto the top of the base of the regulator structure. As a result of this <br /> design change the lump sum costs for bid items #7, #9 and#24 were modified and therefore required <br /> these three existing items to be deleted by change order#1 and new lump sum items#37, #38 and#39 <br /> added to the Contract to reflect the new modified reduced costs agreed upon on these lump sum costs. <br /> This design change also eliminated the need for new MH #3 and thus bid item#12 is being deleted by <br /> change order#1. <br /> Page 4 of 6 <br />