Laserfiche WebLink
; � <br /> 2813 Rockefeller Ave. Everett,WA 98201• ph:425.317.8017 •fax:425.317.8489 <br /> 6. Provide framing plan for the addition that specifies the size, spacing and grade of all framing <br /> lumber used to build the addition. The section drawing references the "spacing of studs per <br /> structural engineer". <br /> �=� �i)IlS2: �VIO�PS 11� fi�l: (IP�%III ��. A '-1�� c�:�S�'fiib��� FIcP.':�' �1"�_'ll I � �._C�i ')il S��IE_` i. ,i =i. ; �O 1i:f� �C�i til( <br /> SIZE'� 5�,!C:IIIy clllC� ri_ :�iil,� O'i 2�I I �iflll(1�� �l� ;�"�" l ,('({ t0 FJLi' �il; <iCi�'Ii=101i <br /> 7. Show the location of the water heater and show how the addition will be heated. <br /> Response: Loc�tion of existing water heater highlighted on existing and proposed plans. Added <br /> .% ; <br /> note to proposed plan adding an in-wall electric unit for freeze prevention in laundry room on <br /> sheet A-2.1. <br /> 8. Show how the roof at the Laundry Room addition is ventilated. <br /> � _ i i ,�_ : /, ����'' ' i G�i'v' � I � I�i`I; i�_i��_ i")' i�'' '��ii= VCf1LS, 1U I.ILlI`IC�I)/ (501'il C�i, �JrOC�OSE�� f(!��F p�dfl Ifl <br /> Sfi "' ,`. L l <br /> 9. Provide minimum 50 CFM exhaust fan in the proposed Laundry Room vented to the exterior. <br /> Response: f�_irl���:' :�xhaust fan in proposed laundry room vented to the: :�;,�� �: �r on sheet A �.�i. <br /> 10. Section CC on sheet A-3.2 shows insulation in the floor, walls and ceiling of the front porch. Please <br /> clarify if this space is to be converted into habitable, heated space. <br /> F'`—� i'u�. �J;ilO�c� c �_ Jf _,�a:11U�'�.. � �Cll�; [, , �L�� il.� � � c_ fl� CI"i=_l�l�-, SLO If�i�li O�-L�"le <br /> I r, <br /> r�i��. �-_ Fron� ���, �, , �: .��� I,�_�;� ��� �,o: �r� <br /> 11. Provide handrail per section 307.1 of the International Property Maintenance Code <br /> (IPMC) <br /> RE'��J.���i�>C': ��'c:l'IOC � _ cc OI c�.lil_i �Itii�l U I �'�CLIJiI��fll�i�l'> LG <I1JA,�; ��11�L ��fli'iL ali I�I� Lfidf1b05 LU �iOIIL <br /> ° ' of the house. Handrail at front steps is already existing, added note to sheet A-2.1. <br /> Sandra Martin, Project Production Manager <br /> Capital Architects Group PC <br /> l <br /> 2 � Page <br />