|
c �
<br /> 2813 Rockefeller Ave. Everett,WA 98201• ph:425.317.8017 •fax:425.317.8489
<br /> 6. Provide framing plan for the addition that specifies the size, spacing and grade of all framing
<br /> lumber used to build the addition.The section drawing references the "spacing of studs per
<br /> structural engineer".
<br /> � �� � i�._.`;...)il;'�_�: I .JL`._� II�I Li:�_� ! .�c.�.i `b' � c �.'.>. ;, .,� �,I �.�. ll�:.i �,-�.� �.. l_ ,)� o _:_l ._.:J i( C�i�U. I Jli.' S:Lcc:
<br /> /'��/ fo„v spacing and grading of all framing lumber used to build the addition, roof framing plan is also
<br /> ��
<br /> > � i�rr,vic��cl, no floor framin� n��ri�-�; �t �cir#iri�r� sii��e th�, fin�_inrl�ti�r� �nns �h;�need tn �r>ncretc� sl�h.
<br /> 7. Show the location of the water heater and show how the addition will be heated.
<br /> � ���������,�: Location of existing water F�� � 'nted on existing �nd proposed �lans. ��ided
<br /> ��,��.. �o proposed plan adding an in-wa�l ��c" _ , �it for freeze prevention in laundry room on
<br /> sheet A-2.1. �f/Q7�l,� �A7�Q i(/07" -5�-�_'a�Al. �/✓9LL �-�G;�'l�2 C_/-�,✓h�c7"j
<br /> 8. Show how the roof at the Laundry Room addition is ventilated.
<br /> � � :,r� ,_ . �J i. �� � � �� � , � � � '��° �� �� ��� �pr;� � > ,_� �u ,i ;.�lan in
<br /> 9. Provide minimum 50 CFM exhaust fan in the proposed Laundry Room vented to the exterior.
<br /> _ � � � � � �� . _,� � i� � _ i� __ ,i�i _ � _ .
<br /> 10. Section CC on sheet A-3.2 shows insulation in the floor, walls and ceiling of the front porch. Please
<br /> clarify if this space is to be converted into habitable, heated space.
<br /> �, .. � � � �-_ _ ���, - �_� _ �._ , � - �� ���� ��nt of the
<br /> � _� � . i� ,� _
<br /> 11. Provide handrail per section 307.1 of the International Property Maintenance Code
<br /> (IPMC)
<br /> _ , � �.. � .. ,�. . i � . ��ii�i � � i ;� �, i: ic . , i. , r_�l:'f. �..� i�„ ch;i�l�;�° i�_� fi�u'r�l
<br /> � ,��„�. � �, � �, � � � , .,
<br /> c�f �I� house. Handrail at front steps is already existing, added note to sheet A-2.1.
<br /> �s� �v,ocT�v�� cm,o�. ��Q�F� r,�.a-� ,��sT,,y�
<br /> Sandra Martin, Project Production Manager ��C-
<br /> Capital Architects Group PC
<br /> 2 � Page
<br />
|