My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3500 TERMINAL AVE 2018-06-08
>
Address Records
>
TERMINAL AVE
>
3500
>
3500 TERMINAL AVE 2018-06-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2018 2:22:58 PM
Creation date
6/8/2018 2:22:33 PM
Metadata
Fields
Template:
Address Document
Street Name
TERMINAL AVE
Street Number
3500
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
improvements. <br /> Phase 2: Installing approximately 3,300 LF of new siding tracks between the South <br /> Terminal and Pacific Terminal. <br /> The Site Plan attached shows the proposed activities. <br /> 12.Location of the proposal. Give sufficient information for a person to understand the <br /> precise location of your proposed project, including a street address,if any, and section, <br /> township, and range, if known. If a proposal would occur over a range of area, provide <br /> the range or boundaries of the site(s). Provide a legal description, site plan, vicinity <br /> map, and topographic map,if reasonably available. While you should submit any plans <br /> required by the agency, you are not required to duplicate maps or detailed plans <br /> submitted with any permit applications related to this checklist. <br /> The property is located at 3500 Terminal Avenue, Everett,Washington, 98201, in Snohomish <br /> County. The Project is located in the NW quarter of Section 30 and the SW quarter of <br /> Section 19, Township 29 North, Range 5 East,Willamette Meridian. The Snohomish County <br /> Tax Parcel Numbers include 290530000201800, 290530000203400, and 29053000201700. <br /> See the Vicinity Map and Site Plan in Attachments 1 and 2. <br /> B. ENVIRONMENTAL ELEMENTS <br /> 1. EARTH <br /> a. General description of the site (circle one): Flat, rolling, hilly, steep slopes, mountainous, <br /> other <br /> b. What is the steepest slope on the site (approximate percent slope)? <br /> The upland portion of the site where rail upgrades will occur is essentially flat. <br /> c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, <br /> muck)? If you know the classification of agricultural soils, specify them and note any <br /> agricultural land of long-term commercial significance and whether the proposal <br /> results in removing any of these soils. <br /> The Project area is entirely paved and maintenance activities will not extend below the <br /> existing gravel fill material. <br /> d. Are there surface indications or history of unstable soils in the immediate vicinity? If <br /> so, describe. <br /> There are no indications or history of unstable soils in the immediate vicinity. <br /> e. Describe the purpose, type, total area, and approximate quantities and total affected <br /> area of any filling, excavation, and grading proposed.Indicate source of fill. <br /> Grading activities proposed as part of the Project will support removal and/or rehabilitation <br /> of existing tracks and will prepare the area for installation of the new,tracks. The excavated <br /> material will primarily consist of approximately 13,000 cubic yards (CY) of existing asphalt <br /> and underlying fill material. Approximately 14,000 CY of clean ballast material will be <br /> placed within excavated areas to bring the tracks to the desired grade. The clean ballast <br /> Port of Everett—Marine Terminal Rail Upgrades �P <br /> SEPA Environmental Checklist(WAC 197-11-960) <br />
The URL can be used to link to this page
Your browser does not support the video tag.