My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3500 TERMINAL AVE 2018-06-08
>
Address Records
>
TERMINAL AVE
>
3500
>
3500 TERMINAL AVE 2018-06-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2018 2:22:58 PM
Creation date
6/8/2018 2:22:33 PM
Metadata
Fields
Template:
Address Document
Street Name
TERMINAL AVE
Street Number
3500
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
material will be sourced from a pre-approved local vendor. In total, approximately 4.0 acres <br /> of ground disturbance will occur from proposed grading activities. <br /> f. Could erosion occur as a result of clearing, construction, or use? If so, generally <br /> describe. <br /> Minor erosion could occur during excavation of underlying fill material. No erosion is <br /> anticipated from use of the completed rail upgrades. <br /> g. About what percent of the site will be covered with impervious surfaces after project <br /> construction (for example, asphalt or buildings)? <br /> No new impervious surfaces are proposed. <br /> h. Proposed measures to reduce or control erosion, or other impacts to the earth,if any: <br /> Erosion control best management practices (BMPs) will be implemented during construction <br /> to reduce or control erosion or other potential impacts to the earth. Erosion control measures <br /> will be addressed in a Temporary Erosion and Sediment Control Plan (TESCP) prepared by <br /> the contractor and adhered to and monitored during construction. No erosion is anticipated <br /> from use of the completed rail upgrades. <br /> 2. AIR <br /> a. What types of emissions to the air would result from the proposal during construction, <br /> operation, and maintenance when the project is completed? If any, generally describe <br /> and give approximate quantities if known. <br /> Limited dust and automobile or construction equipment emissions may occur during <br /> construction. <br /> b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, <br /> generally describe. <br /> There are no off-site sources of emissions or odor that may affect the Project. <br /> c. Proposed measures to reduce or control emissions or other impacts to air,if any: <br /> The duration of emissions is expected to be short and would not exceed existing emissions in <br /> the vicinity. <br /> 3. WATER <br /> a. Surface Water: <br /> 1) Is there any surface water body on or in the immediate vicinity of the site (including <br /> year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, <br /> describe type and provide names. If appropriate, state what stream or river it flows <br /> into. <br /> The rail upgrade Project is located on uplands adjacent to Port Gardner Bay, which is a <br /> part of Possession Sound within Puget Sound. <br /> 2) Will the project require any work over, in, or adjacent to (within 200 feet) the <br /> described waters? If yes,please describe and attach available plans. <br /> Phase 1 of the Project includes work in the upland portion of the marine terminal, with <br /> Port of Everett—Marine Terminal Rail Upgrades <br /> SEPA Environmental Checklist(WAC 197-11-960) ('416,?)) <br />
The URL can be used to link to this page
Your browser does not support the video tag.