Laserfiche WebLink
• <br /> • <br /> • <br /> 5. City prepares review comments for Draft EIS changes. <br /> 6. Consultant prepares rough draft of EIS. <br /> 7. City and consultant review rough draft of EIS. <br /> 8. Consultant types, binds and prints draft EIS in sufficient quantity <br /> to satisfy WAC 197-10-460. The specific number shall be determined <br /> by the Responsible Official. <br /> 9. City mails Draft EIS to agencies with expertise and jurisdiction. <br /> 10. City reviews comments and directs consultant in preparation of <br /> changes and additions to Draft EIS and responses to comments. <br /> 11. Consultant types, binds and prints Final EIS. <br /> 12. City circulates Final EIS. <br /> Section 15: Public Awareness of Availability of Draft EIS <br /> The Responsible Official shall inform the public of the availability of the Draft <br /> EIS and of the procedures for requesting a public hearing by publishing notice in <br /> a newspaper of general circulation and by mailing the notice to all persons who <br /> have made timely written request of the City for such notice. <br /> Section 16: Designation of Official to Perform Consulted Agency Responsibilities <br /> for the City <br /> A. The Responsible Official shall be responsible for the preparation of the <br /> written comments for the City in response to a consultation request <br /> prior to a threshold determination, participation in predraft consultation, <br /> or reviewing a Draft EIS. <br /> B. The Responsible Official shall be responsible for compliance by the City <br /> with WAC 197-10-500 through -540 whenever the City is a consulted <br /> agency, and is hereby authorized to develop operating procedures which <br /> will ensure that responses of consultation requests are prepared in a <br /> timely fashion and include data from all appropriate departments of <br /> the City. <br />