Laserfiche WebLink
1 <br /> the parts of the Contract shall be referred to the Owner's Representative attention for a <br /> determination of the intended requirements. <br /> B. The Work required in one part must be furnished even if not mentioned in other parts of the <br /> Contract. If any part of the Contract requires Work that does not include a description for how the ' <br /> Work is to be performed, the Work shall be performed in accordance with standard trade <br /> practice(s). For purposes of the Contract, a standard trade practice is one having such regularity <br /> of observance in the trade as to justify an expectation that the Contractor will follow or observe <br /> the practice in performing the Work. In case of any ambiguity, disagreement or Dispute over <br /> interpreting the Contract,the Owner's Representative's decision will be final as provided in these <br /> General Conditions. <br /> C. Approved Shop Drawings, other Contractor's Submittals, and the reports and drawings of <br /> subsurface and physical conditions are not Contract Documents. <br /> ARTICLE 2 SPECIFICATIONS AND DRAWINGS 1 <br /> 2.1 Interpretation of Specifications and Drawings <br /> A. The Specifications and Drawings are intended to be explanatory and supportive of each other. <br /> Work specified on the Drawings and not in the Specifications, or vice versa, shall be executed as <br /> if specified in both. In the event the Work to be done or matters relative thereto are not <br /> sufficiently detailed or explained in the Contract Documents, the Contractor shall immediately <br /> ask the Owner's Representative for further explanation and shall comply with such explanation. <br /> In the event of doubt or question arising respecting the true meaning of the Specifications or <br /> Drawings, Contractor shall refer to the Owner's Representative for his or her decision. <br /> B. The Specifications may vary in form, format and style. Some specification sections are written in <br /> varying degrees of streamlined or declarative style and some sections may be relatively narrative <br /> by comparison. Omissions of such words and phrases as "the Contractor shall," "in conformity <br /> with," "as shown," or "as specified" are intentional in streamlined sections. Omitted words and <br /> phrases shall be supplied by inference. Similar types of provisions may appear in various parts of <br /> a section or articles within a part depending on the format of the section. The Contractor shall not <br /> take advantage of any variation of form, format or style in making claims for extra Work. <br /> C. The cross referencing of specification sections under the subparagraph heading"Related Sections ' <br /> include but are not necessarily limited to:" and elsewhere within each specification section is <br /> provided as an aid and convenience to the Contractor. The Contractor shall not rely on the cross <br /> referencing provided and shall be responsible to coordinate the entire Work under the Contract <br /> Documents and provide a complete Project whether or not the cross referencing is provided in <br /> each section or whether or not the cross referencing is complete. <br /> D. Reference to standards, specifications, manuals, or codes of any technical society, organization, , <br /> or association, or to Laws or Regulations, whether such reference be specific or by implication, <br /> shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time <br /> of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as <br /> may be otherwise specifically stated in the Contract Documents. <br /> E. No provision of a standard, specification, manual or code, or an instruction of a Supplier shall be <br /> effective to change the duties or responsibilities of Owner, Contractor, or Owner's <br /> Representative, or their Subcontractors, consultants, agents, or employees from those set forth in <br /> the Contract Documents. No such provision or instruction shall be effective to assign to Owner, <br /> PROCESS WATER PUMP STATION 06/13/2017 <br /> WO-3647 00 72 13 - 10 <br />