CITY OF EVERETT SPECIAL PROVISIONS <br /> Measurement for Gravel Borrow shall be by the ton, recorded on certified weight tickets in <br /> accordance with 1-09.2 WEIGHING EQUIPMENT, and placed within the limits of dimensions <br /> defined in the Work, descriptions for other bid items, shown on the Plans, or COE Standard <br /> Drawings, or as otherwise approved by the Engineer. <br /> Measurement for gravel borrow shall be limited to maximum trench widths defined in the work <br /> descriptions for other bid items. <br /> The unit price per ton, based on certified weight tickets, for gravel borrow shall be full <br /> compensation for all labor, material, tools and equipment necessary to furnish imported <br /> gravel borrow for trench backfill where Engineer has determined native soils are not suitable <br /> for backfill, and other Work as required, from a Contractor-supplied source in accordance <br /> with 2-03.3(14)J of the Standard Specifications and these Special Provisions. <br /> The unit price for gravel borrow shall include all costs of furnishing, hauling, stockpiling, <br /> placing, grading and compacting the material in place. <br /> The unit price for this bid item includes all costs for removing, loading and disposing of <br /> displaced unsuitable material, including haul. <br /> Bid Item A-10: Foundation Material <br /> Measurement and Payment: Unit Price per Ton <br /> Measurement for Foundation Material, Class A or B, or as approved by the engineer, shall <br /> be by the ton, recorded on certified weight tickets in accordance with 1-09.2 WEIGHING <br /> EQUIPMENT, and placed within the limits of dimensions defined in the Contract Documents, <br /> or as otherwise approved by the Engineer. <br /> The unit price per ton, based on certified weight tickets, for foundation material shall be full <br /> compensation for all labor, material, tools and equipment necessary to furnish imported <br /> foundation material where required by the engineer to replace unsuitable material. <br /> The unit price for foundation material shall include all costs of furnishing, hauling, stockpiling, <br /> placing, grading and compacting the material in place. <br /> The unit price for this bid item includes all costs for dewatering and over-excavation, removal <br /> and disposal of unsuitable material below the pipe zone or roadway subgrade, and shall be <br /> full compensation for all labor, materials, tools, and equipment necessary including haul and <br /> tipping fees to dispose of the material. <br /> Bid Item A-11 & B10 &C10: Temporary Roadway Patch <br /> Measurement and Payment: Lump Sum (LS) <br /> No measurement will be made for the lump sum item Temporary Roadway Patch. <br /> Payment for the lump sum item Temporary Roadway Patch shall be a one-time lump sum <br /> regardless of how many times Temporary Roadway Patch is placed, removed, replaced, or <br /> relocated. The lump sum price shall be full compensation for all labor, material, tools and <br /> equipment necessary to satisfactorily complete the Work as defined in the Standard <br /> Specifications, 5-06.3(6) of these Special Provisions and as shown on the Plans. <br /> Bid Item C-11: Combined Sewer Pipe, 18-Inch <br /> Bid Item A-12: Combined Sewer Pipe, 30-inch <br /> Measurement and Payment: Unit Price per Linear Foot <br /> Wetmore Ave Stormwater Division B—BID ITEM DESCRIPTIONS July, 2018 <br /> Bypass Project SP-B -4 Addendum 1 <br />