My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 8/9/2018
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
Interwest Construction Inc 8/9/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2018 9:30:57 AM
Creation date
8/14/2018 9:30:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
8/9/2018
Council Approval Date
8/1/2018
End Date
10/31/2018
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Wetmore Avenue Stormwater Bypass Project
Public Works WO Number
UP3704
Tracking Number
0001358
Total Compensation
$681,696.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> The unit price per linear foot bid for the type and size of combined sewer pipe shall be full <br /> compensation for all labor, material, incidentals, tools and equipment necessary to <br /> satisfactorily complete the work as defined in these Contract Documents. <br /> The unit price per linear foot of combined sewer pipe shall be full compensation for furnishing, <br /> hauling, and assembling in place the completed installation, including all wyes, tees, special <br /> fittings, joint materials and adjustment of inverts to manholes for the completion of the <br /> installation to the required lines and grades. <br /> The unit price of combined sewer pipe shall also include, but not be limited to; all costs for <br /> trench excavation; hauling and disposing of surplus material; dewatering; sewer flow <br /> bypassing; furnishing, stockpiling, hauling and placing and compacting suitable native <br /> backfill; cleaning and flushing pipes and existing structures; testing and inspecting pipe; pipe <br /> separation pads, connecting pipe to and rechanneling of existing structures; reconnecting <br /> existing sanitary sewer; and replacing, protecting and maintaining utilities. <br /> All costs associated with jointing dissimilar types of sewer pipe with a coupling or adapter <br /> shall be included in the unit price for this bid item. <br /> Furnishing, hauling and placing of crushed surface base course for pipe zone bedding shall <br /> be paid under"Crushed Surfacing Base Course". Furnishing, hauling and placing of import <br /> trench backfill (Gravel Borrow) shall be paid under "Gravel Borrow". <br /> The costs for potholing and excavation required to determine exact depths and locations of <br /> other utilities shall be considered as incidental to the work and these costs shall be included <br /> in the unit contract price. <br /> Measurement will be based on actual horizontal length of the combined sewer pipe <br /> constructed and will include the length of the nearest foot, through manholes and wyes. <br /> Bid Item C-12: Combined Sewer Manhole, Type 1, 48-inch DIA. <br /> Bid Item A-13: Combined Sewer Manhole, Type 1, 60-inch DIA. <br /> Bid Item A-14: Combined Sewer Manhole, Type 3, 60-inch DIA. <br /> Measurement and Payment: Unit Price per Each <br /> The unit price per each manhole shall be full compensation for all labor, material, tools and <br /> equipment necessary to satisfactorily complete the work as defined in these Contract <br /> Documents. <br /> The unit price per each manhole shall be full compensation for furnishing, hauling, and <br /> assembling in place the completed installation including all manholes, frames and covers, <br /> pipe connections, special fittings, and joint materials up to a depth of 10-ft as measured from <br /> the flowline of the outlet pipe to the surface of the Work measured to the nearest foot. <br /> The unit price of per each manhole shall also include, but not be limited to, all costs for <br /> excavation; hauling and disposing of surplus or unsuitable material; dewatering; sewer flow <br /> bypassing; furnishing and installing couplings; furnishing and installing steps or ladder; <br /> placing and compacting native backfill; furnishing, placing, and compacting foundation <br /> material as required; cleaning and flushing manholes; reconnecting existing sanitary sewer <br /> connections; and replacing, protecting and maintaining utilities. <br /> All costs associated with abandoning and/or removing and disposing of existing manholes <br /> as shown on the plans shall be included in the unit price for this bid item. <br /> Adjusting new manhole rings and covers to final grade shall be included in the unit price for <br /> this bid item. <br /> Wetmore Ave Stormwater Division B—BID ITEM DESCRIPTIONS July, 2018 <br /> Bypass Project SP-B-5 Addendum 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.