Interwest Construction Inc 8/9/2018
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
Interwest Construction Inc 8/9/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2018 9:30:57 AM
Creation date
8/14/2018 9:30:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
8/9/2018
Council Approval Date
8/1/2018
End Date
10/31/2018
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Wetmore Avenue Stormwater Bypass Project
Public Works WO Number
UP3704
Tracking Number
0001358
Total Compensation
$681,696.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> The unit price per linear foot bid for the type and size of storm drain pipe shall be full <br /> compensation for all labor, material, incidentals, tools and equipment necessary to complete <br /> the work as defined in these Contract Documents. <br /> The unit price per linear foot of storm drain pipe shall be full compensation for furnishing, <br /> hauling, and assembling in place the completed installation, including all wyes, tees, special <br /> fittings, joint materials and adjustment of inverts and connections to inlets, catch basins and <br /> manholes for the completion of the installation to the required lines and grades. <br /> The unit price of storm drain pipe shall also include, but not be limited to; all costs for trench <br /> excavation; hauling and disposing of surplus material; dewatering; storm water flow <br /> bypassing; furnishing, stockpiling, hauling placing and compacting of suitable native backfill; <br /> cleaning and flushing pipes and existing structures; testing and inspecting pipe; pipe <br /> separation pads; connecting pipe to existing structures; reconnecting existing storm drains; <br /> and replacing, protecting, and maintaining utilities. <br /> All costs associated with abandoning existing storm drainage pipe as indicated on the plans <br /> including plugging and/or removal and disposal shall be included in the unit price for this bid <br /> item. <br /> Bid Item A-19 & B12: Inlet <br /> Bid Item A-20: Catch Basin, Type 1 <br /> Bid Item A-21: Catch Basin, Type 1L <br /> Bid Item A-22: Catch Basin, Type 2, 48-inch DIA. <br /> Measurement and Payment: Unit Price per Each <br /> The unit price per each for the inlet or the type and size of catch basin shall be full <br /> compensation for all labor, material, incidentals, tools and equipment necessary to <br /> satisfactorily complete the work as defined in these Contract Documents. <br /> The unit price for each inlet and catch basin shall be full compensation for furnishing, hauling, <br /> and assembling in place the completed installation including inlets, catch basins, frames and <br /> grates, adjustment sections, pipe connections, special fittings, and joint materials up to a <br /> depth of 10-ft as measured from the flowline of the outlet pipe to the surface of the Work <br /> measured to the nearest foot. <br /> The unit price for each inlet and catch basin shall also include, but not be limited to, all costs <br /> for excavation; hauling and disposing of surplus or unsuitable material; dewatering; storm <br /> water flow bypassing, furnishing and installing couplings; furnishing and installing steps or <br /> ladder; placing and compacting of suitable native backfill; furnishing, placing, and compacting <br /> foundation material as required; cleaning and flushing catch basins; reconnecting existing <br /> storm drainage connections; furnishing and installing gas traps; and replacing; protecting, <br /> and maintaining utilities. <br /> All costs associated with abandoning, and/or removing and disposing of existing catch basins <br /> and inlets, salvaging frame and grate or cover, as shown on the plans shall be included in <br /> the unit price for this bid item. <br /> Adjusting new catch basin inlets to final grade is incidental and shall be included in the unit <br /> price for this bid item. <br /> The cost of connection of pipes to the inlet or catch basin is incidental and shall be included <br /> in the unit price for this bid item. <br /> Wetmore Ave Stormwater Division B—BID ITEM DESCRIPTIONS July, 2018 <br /> Bypass Project SP-B-7 Addendum 1 <br />