My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc 8/9/2018
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2018
>
Interwest Construction Inc 8/9/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2018 9:30:57 AM
Creation date
8/14/2018 9:30:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc
Approval Date
8/9/2018
Council Approval Date
8/1/2018
End Date
10/31/2018
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Wetmore Avenue Stormwater Bypass Project
Public Works WO Number
UP3704
Tracking Number
0001358
Total Compensation
$681,696.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> c. Reschedule activities. <br /> If requested by the City's Representative, the Contractor shall prepare a proposed <br /> schedule revision demonstrating a plan to make up the lag in progress and insure <br /> completion of the Work within the Contract Time. All actions taken to return the Project <br /> to the accepted schedule are at the Contractor's expense. <br /> The Contractor shall pay all costs incurred by the City that result from the Contractor's <br /> action to return the Project to its accepted schedule, including, but not limited to, <br /> additional, overtime, or third party inspection, design and construction management <br /> service costs. Contractor agrees that City shall deduct such charges from payments <br /> due the Contractor. It is further understood and agreed that none of the services <br /> performed by the City's Representative in monitoring, reviewing and reporting Project <br /> status and progress shall relieve the Contractor of responsibility for planning and <br /> managing construction Work in conformance with the construction schedule. <br /> 1-08.4(2) Special Construction Constraints <br /> (******) <br /> Refer to 1-08.0(2) for work hours. <br /> Refer to 1-07.23(1) for construction under traffic and 1.07.23(1)A for general traffic <br /> requirements. <br /> Maintain pedestrian access during full block closures. Temporary roadway and sidewalk <br /> patching shall be completed prior to re-opening a closed block of street. <br /> Upon completion of pipe installation and trench backfilling to specifications, promptly <br /> restore street, driveway and sidewalk surfaces and permit public use and access for City <br /> inspection activities. <br /> Parking spaces are normally very limited in most areas of the project and the Contractor <br /> will be required to cooperate with the City in resolving parking issues. In general, <br /> businesses and residents who rely on on-street parking and are displaced by the <br /> construction shall be given priority for the nearest available parking location. The <br /> Contractor's employees may be required to park their personal vehicles away from the <br /> area of construction. <br /> 1-08.5 Time for Completion <br /> Delete all of 1-08.5 and substitute the following: <br /> 1-08.5(1) General <br /> The Contractor shall complete all physical Contract Work within the number of <br /> "working days" stated in the Contract Provisions or as extended by the Engineer in <br /> accordance with Section 1-08.8. Every day will be counted as a "working day" <br /> unless it is a nonworking day or an Engineer determined unworkable day. A <br /> nonworking day is defined as a Saturday, a Sunday, a whole or half day on which <br /> the Contract specifically prohibits Work on the critical path of the Contractor's <br /> approved progress schedule, or one of these holidays: January 1, the third Monday <br /> of January, the third Monday of February, Memorial Day, July 4, Labor Day, <br /> November 11, Thanksgiving Day, the day after Thanksgiving, and Christmas Day. <br /> When any of these holidays fall on a Sunday, the following Monday shall be counted <br /> a nonworking day. When the holiday falls on a Saturday, the preceding Friday shall <br /> be counted a nonworking day. The days between December 25 and January 1 will <br /> be classified as nonworking days. <br /> An unworkable day is defined as a half or whole day the Engineer declares to be <br /> unworkable because of weather or conditions caused by the weather that prevents <br /> Wetmore Ave Stormwater Bypass Division 1 —GENERAL REQUIREMENTS August, 2018 <br /> WO No—UP3704 SP—1-95 <br />
The URL can be used to link to this page
Your browser does not support the video tag.