Laserfiche WebLink
ti <br /> (3) 80th Street S.W. from Hardeson Road West to 16th Avenue W. by <br /> the installation of fire hydrants, storm sewer and sanitary side sewer <br /> installation from existing sewer main, and by the construction of <br /> concrete sidewalk, curbs and gutters, and street lighting system, <br /> said system and improvements to include all incidental material, <br /> appurtenances and work necessary for a complete improvement; and <br /> (4) 75th Street S.W. from Hardeson West to 20th Avenue West, by the <br /> acquisition of necessary right-of-way, and the installation of a 12" <br /> water system, fire hydrants, an 8" sanitary sewer system, lift station <br /> and force main, a storm sewer system, and by the construction of <br /> concrete sidewalks, curbs and gutters, street lighting system and <br /> a traffic light signal at the intersection of 75th Street S.W. and <br /> 20th Avenue West, said systems and improvements to include all <br /> incidental material, appurtenances, and work necessary for a complete <br /> improvement. <br /> All of the aforesaid improvements shall be in accordance with plans to be <br /> prepared by the City Engineer, which plans and specifications are hereby <br /> adopted and approved. <br /> be hereby amended to read: <br /> THAT AN IMPROVEMENT BE MADE OF <br /> (1) Hardeson Road, from S.R. 526 North to 75th St. S.W. by the installation <br /> of a 16" water line connection to existing 16" water system, fire <br /> hydrants and storm sewer, sanitary side sewer installation from <br /> existing main, and by the construction of an asphalt overlay, concrete <br /> sidewalk, curbs and gutters and street lighting system, said systems <br /> and improvements to include all incidental material, appurtenances, <br /> and work necessary for a complete improvement; and, <br /> (2) 16th Avenue West from 75th St.S.W. South to 80th St. S.W. by the <br /> installation of fire hydrants, storm sewer system and the construction <br /> of an asphalt roadway, concrete sidewalk, curbs and gutters and <br /> street lighting system, said systems and improvements to include <br /> all incidental material, appurtenances, and work necessary for a <br /> complete improvement; and <br /> (3) 80th Street S.W. from Hardeson Road West to 16th Avenue W. by <br /> the installation of fire hydrants, storm sewer and sanitary side sewer <br /> installation from existing sewer main, and by the construction of <br /> concrete sidewalk, curbs and gutters, and street lighting system, <br /> said system and improvements to include all incidental material, <br /> appurtenances and work necessary for a complete improvement; and <br /> (4) 75th Street S.W. from Hardeson Road West to 20th Avenue West, by the <br /> acquisition of necessary right-of-way, and the installation of a 12" <br /> water system, fire hydrants, an 8" sanitary sewer system, lift station <br /> and force main, a storm sewer system, and by the construction of <br /> concrete sidewalks, curbs and gutters, street lighting system and <br /> a traffic light signal at the intersection of 75th Street S.W. and <br /> 20th Avenue West, said systems and improvements to include all <br /> incidental material, appurtenances, and work necessary for a complete <br /> improvement. <br /> (5) 75th Street S.W. from Hardeson Road West to a point approximately <br /> 305 feet West of the West line of 16th Avenue West; by the under- <br /> grounding of electrical and communication facilities and to include <br /> all incidentals, materials, appurtenances and work necessary for <br /> a complete improvement; and <br /> (6) 16th Avenue West from 75th Street S.W. to 200 ft. South of the South <br /> line of 75th Street S.W. by the undergrounding of electrical and <br /> communication facilities and to include all incidentals, materials, <br /> appurtenances and work necessary for a complete improvement; and <br /> (3) <br />