My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 723-80
>
Ordinances
>
Ordinance 723-80
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2018 11:12:08 AM
Creation date
9/4/2018 11:12:05 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
723-80
Date
8/27/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Completed application form. <br /> 2. Information required by the "Master Program" for the specific activity <br /> being proposed. <br /> 3. An environmental checklist or impact statement pursuant to Ordinance <br /> No. 582-79. <br /> E. The review process will be either administrative or by public hearings <br /> depending on how the project relates to sections 10 and 11 of this Ordi- <br /> nance. <br /> Section 9: PUBLIC NOTICE REQUIRED: <br /> A. Upon receipt of a complete application for a "Shoreline permit", the City <br /> shall publish notice at least once a week on the same day of the week <br /> for two consecutive weeks in the local newspaper. In addition, the City <br /> shall insure that additional notice is given by at least one of the following <br /> methods: <br /> 1. Mailing to the latest recorded real property owners as shown by <br /> the county assessor within at least 500 feet of the boundary of the <br /> property upon which the "Shoreline permit" is proposed. <br /> 2. Posting of the notice in a conspicuous manner on the property upon <br /> which the project is to be constructed. Such additional notice shall <br /> be given or mailed at least thirty (30) days before the date of <br /> final local approval of the "Shoreline permit". An affidavit of <br /> publication that the notice has been properly published shall be affixed <br /> to the application. Within thirty days (30) of the final publication, <br /> posting or mailing of the notice, whichever comes last, any interested <br /> person may submit his written views upon the application to the <br /> City or notify the City of his desire to receive a copy of the action <br /> taken upon the application. All persons who so submit their views <br /> and all others who so notify the City, shall be notified in a timely <br /> manner of the action taken upon the application. <br /> 3. Notice shall be sent to the Planning Commission and City Council <br /> 4. The notice shall be according to WAC 173-14-070 and contain the <br /> following information: <br /> a. Name of Applicant. <br /> b. Project Description. <br /> c. Project Location. <br /> -6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.