My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LA Consulting Inc 9/12/2018
>
Contracts
>
6 Years Then Destroy
>
2020
>
LA Consulting Inc 9/12/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2018 10:43:03 AM
Creation date
9/13/2018 10:42:51 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
LA Consulting Inc
Approval Date
9/12/2018
End Date
6/1/2020
Department
Public Works
Department Project Manager
Grant Moen
Subject / Project Title
Asset & Maintenance Management Software
Tracking Number
0001423
Total Compensation
$188,270.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> Scope of Work <br /> Product: A review of City's consultant study on management layers and span of control for <br /> the departments. <br /> Task A2.7—Systems Review <br /> A complete analysis of the current systems the Department is using will be conducted. The <br /> inputs and outputs from each of the systems, along with their current usage and purpose for <br /> functionality will be determined. The data from each database will be reviewed and related to <br /> actual processes. Structured interviews with users and maintainers of each of these systems will <br /> occur, including IT/GIS groups. <br /> The utilization, linkage, and functionality of each system along with integration of GIS, SCADA, <br /> and/or any financial systems will also be investigated. Plans for changes and updates will be <br /> outlined. <br /> City assistance: Set up interviews for LAC to discuss existing systems, such as GIS, with key <br /> users and IT. <br /> Product: An understanding and outline of current system utilization and functionality will <br /> be made. <br /> Task A2.8—City Employee Survey <br /> An electronic survey of employees within the Department will be conducted. The purpose of this <br /> survey would be to ascertain the CMMS needs from each employee and work group. As in many <br /> similar agencies, some employees may have limited reading or writing skills, as well as limited <br /> access to computers. To address these challenges,the survey will be developed using easy to <br /> understand, manual forms, as well as electronically. The survey will be conducted completely <br /> confidential of any employee's identity. <br /> After the survey is complete, LAC will review each survey question. The results will be <br /> incorporated as an appendix in the baseline working paper. <br /> City assistance: Advise staff and support LAC in getting employees to respond to survey. <br /> Product: Survey conducted, data analyzed, and results communicated to the City. <br /> Task A2.9—Management Approach and Preparation of Baseline <br /> All key strategic goals and various departmental functions identified in structured interviews will <br /> be further analyzed through the appraisal of available planning documents such as inventories, <br /> needs identification systems, complaints, routine maintenance schedules, activity guidelines, <br /> work methods, and work programs. The scheduling methods and assignment of work processes <br /> within Cassworks and any other relevant systems will be recorded and discussed with various <br /> staff. The work orders or log items that track work performed, hours, and resources expended <br /> will be identified and observed. Finally,the control mechanisms, such as generated reports, will <br /> be evaluated. Any graphs, and/or figures that track effort expended, work accomplished,project <br /> completion, and budgets used will be obtained and generally understood and evaluated. These <br /> work processes will be completely outlined. <br /> 8/14/18 Exhibit A-6 City of Everett, WA <br />
The URL can be used to link to this page
Your browser does not support the video tag.