Laserfiche WebLink
• <br /> 2. Curbs, gutters, drainage and sidewalk on the <br /> west side of Pine Street between 9th and 10th <br /> and a 22 foot asphalt roadbed along the Pine <br /> Street right-of-way between 9th and 10th. <br /> (Estimated cost: $54,777) <br /> 3. Repair of Wiggums Hollow Park. <br /> (Estimated cost: $10,000) <br /> 4. Curbs, gutters, drainage and sidewalks on the <br /> east and west sides of the 1300 and 1400 blocks <br /> of Maple and an asphalt overlay of the existing <br /> roadbed in the 1300 and 1400 blocks of Maple. <br /> (Estimated cost: $72,954) <br /> 5. Sidewalk on the west side of Walnut from 9th to Butler. <br /> (Estimated cost: $4,108) <br /> 6. Sidewalk on the N.W. 140 feet of 17th Street between <br /> Cedar and Pine. <br /> (Estimated cost: $2,000) <br /> D. Lowell Neighborhood Improvements: <br /> 1. One tennis court at Lowell Park. <br /> (Estimated cost $25,000) <br /> 2. Unbreakable covers for lights in Lowell Park and <br /> more lighting. <br /> (Estimated cost: $3,000) <br /> 3. Unenclosed shelter with electrical outlets in <br /> Lowell Park. <br /> (Estimated cost: $10,000) <br /> 4. Completion of walkway from Broadway to 1-5 <br /> overpass on Lowell Road. <br /> (Estimated cost: $7,625) <br /> 5. Curbs, gutters, sidewalks, drainage, street widening <br /> for parking and bicycle path, west side of South <br /> 3rd from 41st to 43rd. <br /> (Estimated cost: $19,039) <br /> 6. Installation of creekbed in 57th Street right-of- <br /> way (Ravenna) . <br /> (Estimated cost: $88,400) <br /> E. Garfield School Playground <br /> 1. To improve recreational opportunities for residents <br /> of the Riverside Neighborhood. <br /> Section 3: Should costs be less for the above projects than <br /> originally estimated, projects receiving the next <br /> highest neighborhood priority shall be included for funding. If <br /> project costs exceed the estimates given, the lowest priority project <br /> or projects will be dropped for funding. <br /> -4- <br />