My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WRK Engineers 10/18/2018
>
Contracts
>
6 Years Then Destroy
>
2019
>
WRK Engineers 10/18/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2018 10:26:28 AM
Creation date
10/25/2018 10:26:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
WRK Engineers
Approval Date
10/18/2018
End Date
1/31/2019
Department
Facilities
Department Project Manager
Chris Lark
Subject / Project Title
Trask Building Seismic Evaluation
Tracking Number
0001452
Total Compensation
$10,500.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
expected consequences of earthquake hazards affecting buildings and translates these consequences into <br /> a clear and understandable 1 star(worst)to 5 star(best) ratings for the three critical measure areas. <br /> The USRC Building Rating considers the performance of a building's structure, mechanical, electrical, and <br /> plumbing systems, and architectural components such as cladding, windows, partitions, and ceilings.The <br /> performance of these elements significantly affects occupant safety, the cost and time to carry out <br /> necessary repairs,and when you can begin using the building again following an earthquake. <br /> Building Ratings are based on ground shaking intensity expected to occur during the lifetime of the <br /> building and is consistent with the benchmarks in the Building Code. <br /> • The SAFETY rating describes the potential for people in the building to get out of the building <br /> unharmed after a major earthquake. <br /> o The DAMAGE rating(expressed as Repair Cost)describes the estimated cost to repair the building <br /> after the earthquake as a percentage of the building's replacement cost. <br /> o The RECOVERY rating(expressed as Time to Regain Basic Function)is an estimate of the minimum <br /> time required to affect repairs and to remove safety hazards and obstacles to an extent necessary <br /> for using the building. Additional time might be needed to restore the building to provide the <br /> functions and operations at levels prior to the earthquake. <br /> WRK understands the City will likely maintain the current use of the building as parking and commercial <br /> office space.As such,WRK recommends at least a 3-star rating for each of the three critical measure areas <br /> when evaluating the Trask Building. <br /> For reference, the USRC Building Rating definitions for the three critical performance metrics are shown <br /> below.The performance expectations that correspond to the 3-star rating WRK will use for this evaluation <br /> have been highlighted. <br /> SAFETY;The potential for people in the building to get out after a disaster and avoid bodily injuries or loss of life.A safety <br /> rating is required in all building evaluations. <br /> * * * * * Injuries and blocking of exit paths unlikely:Expected performance results in conditions unlikely to cause injuries <br /> in to keep people from exiling the!building <br /> * * * * Serious injuries unlikely:Expected performance results in conditions that are unlikely to cause serious injuries. <br /> * * * Loss of life unlikely:Expected performance results in conditions that arc unlikely to cause loss of life. <br /> * * Loss of life possible in isolated locations:Expected performance results in conditions associated with partial <br /> collapse or falling objects,which have a potential to cause loss of life at some locations within or around the building <br /> * Loss of life likely In the building:Expected performance results in conditions associated calls building collapse, <br /> t iiirh has a high potential to c auto death within or around the building. <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.