My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WRK Engineers 10/18/2018
>
Contracts
>
6 Years Then Destroy
>
2019
>
WRK Engineers 10/18/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2018 10:26:28 AM
Creation date
10/25/2018 10:26:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
WRK Engineers
Approval Date
10/18/2018
End Date
1/31/2019
Department
Facilities
Department Project Manager
Chris Lark
Subject / Project Title
Trask Building Seismic Evaluation
Tracking Number
0001452
Total Compensation
$10,500.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Repair cost as a percentage of the building's overall replacement cost including structural,architectural,mechanical, <br /> electrical and plumbing systems.It does not include damage caused by breaksileaks in water and gas pipes or contents damage. <br /> * * * * * Minimal damage:Repair Cost likely less than 5°:;of building replacement cost. <br /> * * * * Moderate damage:Repair Cost likely less than 10 sa of building replacement cost. <br /> * * * Significant damage:Repair Cost likely less than?O. of budding replacement cost. <br /> * * Substantial damage:Repair Cost likely less than 403;,of building replacement cost. <br /> * Severe damage:Repair Cost likely greater than 40"")of building replacement cost. <br /> RE CovtRY:An estimate of the MINIMUM timeframe to carry out sufficient repairs and to remove major safety hazards and obsta- <br /> cles to regain occupancy and use of the building,but not necessarily restore it to its full intended functions. <br /> *, *, * * r` immediately to days:The expected performance will likely result in people being able to quickly re-enter and <br /> resume use of the building hon immediately to a few days,excluding external factors. <br /> 1 <br /> * * * * Within days to weeks:The expected performance may result in delay of minimum operational use for days to <br /> weeks.excluding external factors <br /> * * ,* Within weeks to months:The expected performance may result in delay of minimum operational use for weeks to <br /> months,excluding extol nal tactors. <br /> * * Within months to a year:Expected performance may result in delay of minimum operational use for months to <br /> a year <br /> * More than one year:Expected performance may result in delay of minimum operational use for at least one year <br /> or more <br /> As part of the WRK seismic evaluation,they will provide the approximate"as-built" USRC Building Ratings <br /> to clearly communicate the expected current building performance. Subsequently, a menu of seismic <br /> strengthening options will be developed to raise the "as-built" rating into alignment with the desired <br /> performance rating (i.e. raise building to 3-star performance).This will be accomplished by addressing all <br /> the known deficiencies using the ASCE 41-17 Tier 2 procedures. <br /> Where appropriate, strengthening options will be identified and presented to the City to determine the <br /> best value concepts for achieving the desired target building rating. Considerations such as construction <br /> impacts to building occupants, construction phasing, and cost effectiveness will be incorporated into the <br /> discussion of best value concepts. <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.