Laserfiche WebLink
IU. Permits are required from the Fire Derartment fur remo�•al and iustullation uf <br /> underground fuel tanks. <br /> 1I. All fire alarm control panels (FACP) and sprinkler valves shail be in heated rooms ur <br /> closets with standard man door access. Locations shall be approved hy the Fire Marsh:�l's <br /> Office. <br /> Public 11'orks: Dennis Roberson (425)257-7257 <br /> I . r1 !'ublic Works Permit is requircd far ihis project. Uetaile� dra�cings in accor�l,utce ��itli ( ii} <br /> Design an� Construction Standards shall be submitted !o �he Vublic Works Department, sho�c:i��� <br /> site parking layout, landscaping, utilities, storm drainage, temporary construction erosion conin�l. <br /> and all required improvements in tlie public right-of-way. Public �Vorks Department approval ��f <br /> these drawings is required prior to any permit he;ug issued. All improvements shall be complcic� <br /> and approved warranted beFore the Occupancy Permit is issued/final approval is grantcd. <br /> '_. Parking must be per City Zoning Code and City Design and Construction Standards tur <br /> Devclopmcnt. <br /> +. Any grading/f II on this site shall be done so as to not impact the surrounding propertics. <br /> I. Adherence to tl�c City of Evemtt Building Code and a building permit is required. <br /> 5. Spccial charges fbr connection to the sawer and water systenu in accordance with Or�inauce 1995- <br /> 9-t and suhsequent revision are applicable. These charges are based on projected wacer usagc an� <br /> c:m be substantiaL Applicant is encouraged to obtain a copy of the OrJinance and determinc <br /> rstimated charges prior to building pettnit application. The actua! charges shall be computed b�• �hc <br /> Public Works Department per the ordinance in effect at the time and accordin u t ie i�tbrmauo�i <br /> on Qie approved plans at Uie time of buildi�permit issuance. 1�r /�c/J — <br /> /28�f-O — SD7Z = %%6 �9 Sr o� ni'•;.r� )( D.ZSIf 9 �IGJ��,FG� .�tC/ %� <br /> � <br /> b. Ciry streets and alleys are to be kept clear of dirt and debris at all times d ring construction. llust <br /> suppression and street cleaning must occur as directed by the Public Works s ector. �� <br /> 7. Any broken or damaged sidewalk shall be repaired/replaced per the Ciry Public Works Inspector. <br /> S. Walkways must be provided to Evergreen Way as shown on site plan. <br /> 9. Temporary erosion control measures for construction activity must be operational prior to <br /> commencement of any clearing or earthwork. <br /> IU. A traffic mitigation fee of$1,487.00 is required prior to Building Permit issu;�nce. <br /> 1 ! Swrm water treaunent will be required if 5,000 square feet or more uf hydraulically-connec�ed <br /> pavement is created and/or redeveloped by this project. Treatment of storm watcr runotF from <br /> h}draulically-connected pavement must occur, per Ciry standards, prior to discharce of �he siorm <br /> �.v,iter frnm the sitc, or tn a strrarn, �actlaod, or underground infiltratinn s��stem. <br />