My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8609 EVERGREEN WAY COMMUNITY HEALTH CENTER 2018-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
8609
>
COMMUNITY HEALTH CENTER
>
8609 EVERGREEN WAY COMMUNITY HEALTH CENTER 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2018 11:59:31 AM
Creation date
10/25/2018 11:57:40 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
8609
Tenant Name
COMMUNITY HEALTH CENTER
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IU. Permits are required from the Fire Derartment fur remo�•al and iustullation uf <br /> underground fuel tanks. <br /> 1I. All fire alarm control panels (FACP) and sprinkler valves shail be in heated rooms ur <br /> closets with standard man door access. Locations shall be approved hy the Fire Marsh:�l's <br /> Office. <br /> Public 11'orks: Dennis Roberson (425)257-7257 <br /> I . r1 !'ublic Works Permit is requircd far ihis project. Uetaile� dra�cings in accor�l,utce ��itli ( ii} <br /> Design an� Construction Standards shall be submitted !o �he Vublic Works Department, sho�c:i��� <br /> site parking layout, landscaping, utilities, storm drainage, temporary construction erosion conin�l. <br /> and all required improvements in tlie public right-of-way. Public �Vorks Department approval ��f <br /> these drawings is required prior to any permit he;ug issued. All improvements shall be complcic� <br /> and approved warranted beFore the Occupancy Permit is issued/final approval is grantcd. <br /> '_. Parking must be per City Zoning Code and City Design and Construction Standards tur <br /> Devclopmcnt. <br /> +. Any grading/f II on this site shall be done so as to not impact the surrounding propertics. <br /> I. Adherence to tl�c City of Evemtt Building Code and a building permit is required. <br /> 5. Spccial charges fbr connection to the sawer and water systenu in accordance with Or�inauce 1995- <br /> 9-t and suhsequent revision are applicable. These charges are based on projected wacer usagc an� <br /> c:m be substantiaL Applicant is encouraged to obtain a copy of the OrJinance and determinc <br /> rstimated charges prior to building pettnit application. The actua! charges shall be computed b�• �hc <br /> Public Works Department per the ordinance in effect at the time and accordin u t ie i�tbrmauo�i <br /> on Qie approved plans at Uie time of buildi�permit issuance. 1�r /�c/J — <br /> /28�f-O — SD7Z = %%6 �9 Sr o� ni'•;.r� )( D.ZSIf 9 �IGJ��,FG� .�tC/ %� <br /> � <br /> b. Ciry streets and alleys are to be kept clear of dirt and debris at all times d ring construction. llust <br /> suppression and street cleaning must occur as directed by the Public Works s ector. �� <br /> 7. Any broken or damaged sidewalk shall be repaired/replaced per the Ciry Public Works Inspector. <br /> S. Walkways must be provided to Evergreen Way as shown on site plan. <br /> 9. Temporary erosion control measures for construction activity must be operational prior to <br /> commencement of any clearing or earthwork. <br /> IU. A traffic mitigation fee of$1,487.00 is required prior to Building Permit issu;�nce. <br /> 1 ! Swrm water treaunent will be required if 5,000 square feet or more uf hydraulically-connec�ed <br /> pavement is created and/or redeveloped by this project. Treatment of storm watcr runotF from <br /> h}draulically-connected pavement must occur, per Ciry standards, prior to discharce of �he siorm <br /> �.v,iter frnm the sitc, or tn a strrarn, �actlaod, or underground infiltratinn s��stem. <br />
The URL can be used to link to this page
Your browser does not support the video tag.