Laserfiche WebLink
1 The Contractor's records pertaining to the requirements of this Special Provision shall be I <br /> 2 open to inspection or audit by representatives of the Contracting Agency during the life <br /> 3 of the contract and for a period of not less than three years after the date of acceptance <br /> 4 of the contract. The Contractor shall retain these records for that period. The Contractor <br /> 5 shall also guarantee that these records of all Subcontractors and lower tier <br /> 6 Subcontractors shall be available and open to similar inspection or audit for the same <br /> 7 time period. , <br /> 8 <br /> 10 Progress Schedule <br /> 11 <br /> 12 " 'f '_ <br /> 13 1-08.3(2)A Type A Progress Schedule <br /> 14 (March 13, 2012 APWA GSP) <br /> 15 <br /> 16 Revise this section to read: <br /> 17 <br /> 18 The Contractor shall submit $$ 3 $$ copies of a Type A Progress Schedule no later than <br /> 19 at the preconstruction conference, or some other mutually agreed upon submittal time. <br /> 20 The schedule may be a critical path method (CPM) schedule, bar chart, or other standard <br /> 21 schedule format. Regardless of which format used, the schedule shall identify the critical <br /> 22 path. The Engineer will evaluate the Type A Progress Schedule and approve or return the <br /> 23 schedule for corrections within 15 calendar days of receiving the submittal. <br /> 24 <br /> 25 <br /> 26 1-08.4 Prosecution of Work I <br /> 27 <br /> 28 Delete this section and replace it with the following: <br /> 29 <br /> 30 1-08.4 Notice to Proceed and Prosecution of Work <br /> 31 (July 23, 2015 APWA GSP) <br /> 32 <br /> 33 Notice to Proceed will be given after the contract has been executed and the contract <br /> 34 bond and evidence of insurance have been approved and filed by the Contracting <br /> 35 Agency. The Contractor shall not commence with the work until the Notice to Proceed <br /> 36 has been given by the Engineer. The Contractor shall commence construction activities <br /> 37 on the project site within ten days of the Notice to Proceed Date, unless otherwise <br /> 38 approved in writing. The Contractor shall diligently pursue the work to the physical <br /> 39 completion date within the time specified in the contract. Voluntary shutdown or slowing <br /> 40 of operations by the Contractor shall not relieve the Contractor of the responsibility to <br /> 41 complete the work within the time(s) specified in the contract. <br /> 42 <br /> 43 When shown in the Plans, the first order of work shall be the installation of high visibility <br /> 44 fencing to delineate all areas for protection or restoration, as described in the Contract. <br /> 45 Installation of high visibility fencing adjacent to the roadway shall occur after the <br /> 46 placement of all necessary signs and traffic control devices in accordance with 1-10.1(2). <br /> 47 Upon construction of the fencing, the Contractor shall request the Engineer to inspect <br /> 48 the fence. No other work shall be performed on the site until the Contracting Agency has <br /> 49 accepted the installation of high visibility fencing, as described in the Contract. <br /> 50 <br /> N. BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> STATE FUND#GCB2316; COE WO#3644 60 August 8, 2018 <br />