My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 111 1 1.O5.5.GRr <br /> 2 Time for Completion <br /> 3 <br /> 5 Section 1-08.5 is supplemented with the following: <br /> 6 <br /> I 7 F1-O e5.OPT.7'-workfnci dars.DOCX <br /> 8 (March 13, 1995) <br /> 9 This project shall be physically completed within *** 110*** working days. <br /> 1 10 <br /> 11 1-38.5 QptionA.e <br /> 12 1-08.5 Time for Completion <br /> I 13 (September 12, 2016 APWA GSP, Option A) <br /> 14 <br /> 15 Revise the third and fourth paragraphs to read: <br /> 16 <br /> 17 Contract time shall begin on the first working day following the Notice to Proceed Date. <br /> 18 <br /> 19 Each working day shall be charged to the contract as it occurs, until the contract work is <br /> 111 <br /> 20 physically complete. If substantial completion has been granted and all the authorized <br /> 21 working days have been used, charging of working days will cease. Each week the <br /> 22 Engineer will provide the Contractor a statement that shows the number of working days: <br /> 23 (1) charged to the contract the week before; (2) specified for the physical completion of <br /> 24 the contract; and (3) remaining for the physical completion of the contract. The <br /> 25 statement will also show the nonworking days and any partial or whole day the Engineer <br /> I <br /> 26 <br /> 27 declares as unworkable. Within 10 calendar days after the date of each statement, the <br /> Contractor shall file a written protest of any alleged discrepancies in it. To be considered <br /> 28 by the Engineer, the protest shall be in sufficient detail to enable the Engineer to <br /> 29 ascertain the basis and amount of time disputed. By not filing such detailed protest in <br /> 30 that period, the Contractor shall be deemed as having accepted the statement as <br /> 31 correct. If the Contractor is approved to work 10 hours a day and 4 days a week (a 4-10 <br /> 32 schedule) and the fifth day of the week in which a 4-10 shift is worked would ordinarily <br /> 111 33 be charged as a working day then the fifth day of that week will be charged as a working <br /> 34 day whether or not the Contractor works on that day. <br /> 35 <br /> I 36 Revise the sixth paragraph to read: <br /> 37 <br /> 38 The Engineer will give the Contractor written notice of the completion date of the <br /> 39 contract after all the Contractor's obligations under the contract have been performed by <br /> 40 the Contractor. The following events must occur before the Completion Date can be <br /> 41 established: <br /> I42 1. The physical work on the project must be complete; and <br /> 43 2. The Contractor must furnish all documentation required by the contract and required <br /> 44 by law, to allow the Contracting Agency to process final acceptance of the contract. <br /> 45 The following documents must be received by the Project Engineer prior to <br /> 46 establishing a completion date: <br /> 47 a. Certified Payrolls (per Section 1-07.9(5)). <br /> 48 b. Material Acceptance Certification Documents <br /> 49 c. Monthly Reports of Amounts Credited as DBE Participation, as required by the <br /> III50 Contract Provisions. <br /> N. BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> STATE FUND#GCB2316; COE WO#3644 61 August 8, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.