McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I1 excessive amount of material on the pavement surface, stop and correct the operation to <br /> 2 eliminate the excess material. <br /> I3 <br /> 4 5-04.3(4)A2 Crack Sealing Areas Prior to Paving <br /> 5 In areas where HMA will be placed, use sand slurry to fill the cracks. <br /> I 6 <br /> 7 5-04.3(4)A3 Crack Sealing Areas Not to be Paved <br /> 8 In areas where HMA will not be placed, fill the cracks as follows: <br /> I9 <br /> 10 A. Cracks 1/4 inch to 1 inch in width - fill with hot poured sealant. <br /> 11 B. Cracks greater than 1 inch in width — fill with sand slurry. <br /> 12 <br /> 13 5-04.3(4)B Vacant <br /> I 14 <br /> 15 5-04.3(4)C Pavement Repair <br /> 16 The Contractor shall excavate pavement repair areas and shall backfill these with HMA <br /> 17 in accordance with the details shown in the Plans and as marked in the field. The <br /> 18 Contractor shall conduct the excavation operations in a manner that will protect the <br /> 19 pavement that is to remain. Pavement not designated to be removed that is damaged as <br /> I 20 a result of the Contractor's operations shall be repaired by the Contractor to the <br /> 21 satisfaction of the Engineer at no cost to the Contracting Agency. The Contractor shall <br /> 22 excavate only within one lane at a time unless approved otherwise by the Engineer. The <br /> I 23 Contractor shall not excavate more area than can be completely finished during the <br /> 24 same shift, unless approved by the Engineer. <br /> 25 <br /> I 26 Unless otherwise shown in the Plans or determined by the Engineer, excavate to a <br /> 27 depth of 1.0 feet. The Engineer will make the final determination of the excavation depth <br /> 28 required. The minimum width of any pavement repair area shall be 40 inches unless <br /> I 29 shown otherwise in the Plans. Before any excavation, the existing pavement shall be <br /> 30 sawcut or shall be removed by a pavement grinder. Excavated materials will become the <br /> 31 property of the Contractor and shall be disposed of in a Contractor-provided site off the <br /> I 32 Right of Way or used in accordance with Sections 2-02.3(3) or 9-03.21. <br /> 33 <br /> 34 Asphalt for tack coat shall be required as specified in Section 5-04.3(4). A heavy <br /> 35 application of tack coat shall be applied to all surfaces of existing pavement in the <br /> 36 pavement repair area. <br /> 37 <br /> I 38 Placement of the HMA backfill shall be accomplished in lifts not to exceed 0.35-foot <br /> 39 compacted depth. Lifts that exceed 0.35-foot of compacted depth may be accomplished <br /> 40 with the approval of the Engineer. Each lift shall be thoroughly compacted by a <br /> I41 mechanical tamper or a roller. <br /> 42 <br /> 43 5-04.3(5) Producing/Stockpiling Aggregates and RAP <br /> I44 Aggregates and RAP shall be stockpiled according to the requirements of Section 3-02. <br /> 45 Sufficient storage space shall be provided for each size of aggregate and RAP. Materials <br /> 46 shall be removed from stockpile(s) in a manner to ensure minimal segregation when <br /> N. BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> I <br /> STATE FUND#GCB2316; COE WO#3644 81 August 8, 2018 <br />