My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I1 detail shown in the Standard Plan. Con-struct the sawcut in accordance with Section 5- <br /> 2 05.3(8)B and the manufacturer's application procedure. <br /> 1 3 <br /> 4 5-04.3(12)B2 Paved Panel Joint Seal <br /> 5 Construct the paved panel joint seal in accordance with the requirements specified in <br /> I 6 section 5-04.3(12)B1 and the following requirement: <br /> 7 <br /> 8 1. Clean and seal the existing joint between concrete panels in accordance with <br /> 9 Section 5-01.3(8) and the details shown in the Standard Plans. <br /> 10 <br /> 11 5-04.3(13) Surface Smoothness <br /> t12 The completed surface of all courses shall be of uniform texture, smooth, uniform as to <br /> 13 crown and grade, and free from defects of all kinds. The completed surface of the <br /> 14 wearing course shall not vary more than 1/8 inch from the lower edge of a 10-foot <br /> I 15 straightedge placed on the surface parallel to the centerline. The transverse slope of the <br /> 16 completed surface of the wearing course shall vary not more than 1/4 inch in 10 feet from <br /> 17 the rate of transverse slope shown in the Plans. <br /> I18 <br /> 19 When deviations in excess of the above tolerances are found that result from a high <br /> 20 place in the HMA, the pavement surface shall be corrected by one of the <br /> 21 following methods: <br /> 22 <br /> I 23 1. Removal of material from high places by grinding with an approved grinding <br /> 24 machine, or <br /> 25 2. Removal and replacement of the wearing course of HMA, or <br /> I 26 3. By other method approved by the Engineer. <br /> 27 <br /> 28 Correction of defects shall be carried out until there are no deviations anywhere greater <br /> I29 than the allowable tolerances. <br /> 30 <br /> I 31 Deviations in excess of the above tolerances that result from a low place in the HMA and <br /> 32 deviations resulting from a high place where corrective action, in the opinion of the <br /> 33 Engineer, will not produce satisfactory results will be accepted with a price adjustment. <br /> 34 The Engineer shall deduct from monies due or that may become due to the Contractor <br /> I35 the sum of$500.00 for each and every section of single traffic lane 100 feet in length in <br /> 36 which any excessive deviations described above are found. <br /> 1 37 <br /> 38 When utility appurtenances such as manhole covers and valve boxes are located in the <br /> 39 traveled way, the utility appurtenances shall be adjusted to the finished grade prior to <br /> mi 40 paving. This requirement may be waived when requested by the Contractor, at the <br /> 111 41 discretion of the Engineer or when the adjustment details provided in the project plan or <br /> 42 specifications call for utility appurtenance adjustments after the completion of paving. <br /> I 43 <br /> 44 Utility appurtenance adjustment discussions will be included in the Pre-Paving planning <br /> 45 (5-04.3(14)B3). Submit a written request to waive this requirement to the Engineer prior <br /> 1 46 to the start of paving. <br /> N. BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> ISTATE FUND#GCB2316; COE WO#3644 93 August 8, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.