My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I1 1. The photovoltaic panel shall be UL Listed 100W and shall provide five days of <br /> 2 battery back-up. <br /> I 3 2. The solar charge controller shall be automatically set for dusk-to-dawn illumination. <br /> 4 3. Illumination shall be high intensity 5W white light emitting diodes (LED) rated for <br /> 5 outdoor/ damp environments. LED fixtures shall provide 3.5 foot candle minimum <br /> 6 illuminance measured at 2 ft. above the concrete shelter pad and illuminate a <br /> I 7 minimum of 45 square feet to a minimum 1.0 foot candles. <br /> 8 4. The solar array to load ratio (ALR) shall be 1.25 ALR minimum. Photovoltaic <br /> 9 Batteries shall be rechargeable, non-spillable, sealed, absorbed glass mat (AGM) <br /> I10 type. <br /> 11 5. All hardware shall be tamper resistant hardware with two hardware tools included. <br /> 12 6. The solar lighting package shall be integrated under the shelter roof with adjustable <br /> 13 mounting hardware. The finish shall be powder coated to match the shelter finish. <br /> 14 Replacement manufacture and part numbers shall be provided for all components. <br /> 15 <br /> I 16 All costs to install solar luminaires and associated solar package shall be included in the <br /> 17 associated lump sum bid item for each bus shelter. <br /> 18 <br /> I 19 <br /> 20 8-30.3(9)Bike Rack <br /> 21 <br /> I <br /> 22 <br /> 23 Bike shaped bike rack should be constructed with 1.5" OD 11 powder coated (RAL <br /> 3020) finished or stainless steel. Each rack shall has two mounting brackets double <br /> 24 gusset welded to wheels". Brackets shall be 40" apart. Each bracket is anchored <br /> 25 to the ground per manufacturer's recommendations. <br /> I 26 <br /> 27 8-30.3(10) 32 Gal. Surface mount Flare Receptacles with Door and Lid <br /> 28 <br /> I29 TRASH RECEPTACLES: <br /> 30 Expanded metal receptacles shall have 3/4" #9 expanded steel mesh with 5/16" <br /> 31 diameter steel rod, joining the ends of fabricated metals to form the seam of their <br /> I 32 diameter. Finish dimensions shall measure 32 1/8" od wide at flare top x 36 1/4" high <br /> 33 to bottom of receptacle. <br /> 34 Rib panel is 10 gage, and perforated panel is 12 gage sheet metal. A 3/4" diameter <br /> I 35 steel tube is used to add support at top and bottom. Tubing on top of the flare tops <br /> 36 are replaced with aluminum cast flare. Bottom is supported by 12 gage sheet steel <br /> 37 floor. <br /> I 38 <br /> 39 GROUND SPACE REQUIRMENTS: <br /> 40 Ground space requirements are 32 1 /8" diameter x 38 1 /8" - Perf and 37 7/8" - Rib, <br /> I 41 tall. With door open to remove liner the width is 40". If a leg is used the height will be <br /> 42 an additional 6". <br /> 43 <br /> 44 LIDS: <br /> 45 Lid top shall be cast aluminum ash solid bonnet with downward slant. Lid bottom <br /> 46 shall be cast aluminum ash solid bonnet with upward slant. Overall dimensions is <br /> 47 22 7/8" x 93/4" tall, with opening of 8" diameter. <br /> I 48 <br /> 49 LEG PACKAGES: <br /> 50 Surface mount leg uses �/4" plate steel for surface mount plate. <br /> I <br /> I N. BROADWAY TRANSIT IMPROVEMENT PROJECT <br /> STATE FUND#GCB2316; COE WO#3644 137 August 8, 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.