My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I1 <br /> 2 Materials shall meet the requirements of the following sections: <br /> I 3 <br /> 4 Corrugated Polyethylene Drain Pipe 9-05.1(6) <br /> 5 Quarry Spalls 9-13 <br /> 6 Erosion Control and Roadside Planting 9-14 <br /> 7 Construction Geotextile 9-33 <br /> 8 <br /> 9 8-01.3(1) General <br /> I <br /> 10 This section is revised to read: <br /> 11 <br /> 12 Adaptive management shall be employed throughout the duration of the project for the <br /> I13 implementation of erosion and water pollution control permit requirements for the current <br /> 14 condition of the project site. The adaptive management includes the selection and <br /> 15 utilization of BMPs, scheduling of activities, prohibiting unacceptable practices, <br /> I 16 implementing maintenance procedures, and other managerial practices that when used <br /> 17 singularly or in combination, prevent or reduce the release of pollutants to waters of the <br /> 18 State. The adaptive management shall use the means and methods identified in this <br /> I 19 <br /> 20 section and means and methods identified in the Washington State Department of <br /> Transportation's Temporary Erosion and Sediment Control Manual or the Washington <br /> 21 State Department of Ecology's Stormwater Management Manuals for construction <br /> 22 stormwater. <br /> 23 <br /> 24 The Contractor shall install a high visibility fence along the site preservation lines shown <br /> 25 in the Plans or as instructed by the Engineer. <br /> I <br /> 26 <br /> 27 Throughout the life of the project, the Contractor shall preserve and protect the delineated <br /> 28 preservation area, acting immediately to repair or restore any fencing damaged or <br /> I 29 removed. <br /> 30 <br /> 31 All discharges to surface waters shall comply with surface water quality standards as <br /> I 32 defined in Washington Administrative Code (WAC) Chapter 173-201A. All discharges to <br /> 33 the ground shall comply with groundwater quality standards WAC Chapter 173-200. <br /> 34 <br /> I 35 The Contractor shall comply with the CSWGP when the project is covered by the <br /> 36 CSWGP. Temporary Work, at a minimum, shall include the implementation of: <br /> 37 <br /> 38 1. Sediment control measures prior to ground disturbing activities to ensure all <br /> I 39 discharges from construction areas receive treatment prior to discharging from <br /> 40 the site. <br /> 41 <br /> 42 2. Flow control measures to prevent erosive flows from developing. <br /> 43 <br /> 44 3. Water management strategies and pollution prevention measures to prevent <br /> I 45 contamination of waters that will be discharged to surface waters or the ground. <br /> 46 <br /> 47 4. Erosion control measures to stabilize erodible earth not being worked. <br /> ' 48 <br /> 49 5. Maintenance of BMPs to ensure continued compliant performance. <br /> 50 <br /> i <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.