My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
McCann Construction Enterprises Inc 11/7/2018
>
Contracts
>
Capital Contract
>
McCann Construction Enterprises Inc 11/7/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2019 9:16:10 AM
Creation date
11/8/2018 10:04:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McCann Construction Enterprises Inc
Approval Date
11/7/2018
Council Approval Date
10/3/2018
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
N Broadway Transit Improvement Project
Public Works WO Number
PW3644
Tracking Number
0001465
Total Compensation
$2,249,764.10
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
McCann Construction Enterprises Inc 10/22/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 6. Immediate corrective action if evidence suggests construction activity is not in I <br /> 2 compliance. Evidence includes sampling data, olfactory or visual evidence such <br /> 3 as the presence of suspended sediment, turbidity, discoloration, or oil sheen in <br /> 4 discharges. <br /> 5 <br /> 6 To the degree possible, the Contractor shall coordinate this temporary Work with <br /> 7 permanent drainage and erosion control Work the Contract requires. <br /> 8 <br /> 9 Clearing, grubbing, excavation, borrow, or fill within the Right of Way shall never expose <br /> 10 more erodible earth than as listed below: <br /> 11 <br /> Western Washington Eastern Washington <br /> (West of the Cascade (East of the Cascade <br /> I <br /> Mountain Crest) Mountain Crest) <br /> May 1 through 17 Acres April 1 through 17 Acres <br /> September 30 October 31 <br /> October 1 November 1 <br /> through April 5 Acres through March 5 Acres <br /> 30 31 <br /> 12 <br /> 13 The Engineer may increase or decrease the limits based on project conditions. <br /> 14 <br /> 15 Erodible earth is defined as any surface where soils, grindings, or other materials may be <br /> 16 capable of being displaced and transported by rain, wind, or surface water runoff. <br /> 17 11118 Erodible earth not being worked, whether at final grade or not, shall be covered within <br /> 19 the specified time period (see the table below), using BMPs for erosion control. <br /> 20 <br /> Western Washington Eastern Washington <br /> (West of the Cascade (East of the Cascade <br /> Mountain Crest) Mountain Crest) <br /> October 1 2 days October 1 5 days <br /> through April maximum through June 30 maximum <br /> 30 <br /> May 1 to 7 days November 1 10 days I <br /> September 30 maximum thlrough March maximum <br /> 21 <br /> 111 <br /> 22 When applicable, the Contractor shall be responsible for all Work required for compliance <br /> 23 with the CSWGP including annual permit fees. <br /> 24 I 25 If the Engineer, under Section 1-08.6, orders the Work suspended, the Contractor shall <br /> 26 continue to comply with this division during the suspension. <br /> 27 <br /> 28 Nothing in this Section shall relieve the Contractor from complying with other Contract <br /> 29 requirements. <br /> 30 <br /> 31 8-01.3(1)A Submittals <br /> 32 This section's content is deleted. <br /> 33 <br /> i <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.