Laserfiche WebLink
1 <br /> 2 8-04.3(1) Cement Concrete Curbs, Gutters, and Spillways <br /> 3 The first paragraph is supplemented with the following: <br /> 4 <br /> 5 Roundabout truck apron cement concrete curb and gutter shall be constructed with air <br /> 6 entrained concrete Class 4000 conforming to the requirements of Section 6-02. <br /> 7 <br /> 8 8-06.AP8 <br /> 9 Section 8-06, Cement Concrete Driveway Entrances <br /> 10 April 2, 2018 <br /> 11 8-06.2 Materials <br /> 12 In the first paragraph, the reference to "Portland Cement" is revised to read: <br /> 13 <br /> 14 Cement 9-01 <br /> I 15 <br /> 16 8-06.3 Construction Requirements <br /> 17 The first paragraph is revised to read: <br /> I 18 <br /> 19 Cement concrete driveway approaches shall be constructed with air entrained concrete <br /> 20 Class 4000 conforming to the requirements of Section 6-02 or Portland Cement or <br /> 21 Blended Hydraulic Cement Concrete Pavement conforming to the requirements of <br /> 22 Section 5-05. <br /> 23 <br /> 24 8-07.AP8 <br /> 25 Section 8-07, Precast Traffic Curb <br /> 26 April 2, 2018 <br /> 27 8-07.3(1) Installing Curbs <br /> 28 The first sentence of the first paragraph is revised to read: <br /> 29 <br /> 30 The curb shall be firmly bedded for its entire length and breadth on a mortar bed <br /> 31 conforming to Section 9-20.4(3) composed of one part Portland cement or blended <br /> 32 hydraulic cement and two parts sand. <br /> 33 <br /> 34 The fourth paragraph is revised to read: <br /> 35 <br /> 36 All joints between adjacent pieces of curb except joints for expansion and/or drainage as <br /> 37 designated by the Engineer shall be filled with mortar composed of one part Portland <br /> 38 cement or blended hydraulic cement and two parts sand. <br /> 49 <br /> 40 8-11.AP8 <br /> 41 Section 8-11, Guardrail <br /> 42 August 6, 2018 <br /> 43 8-11.3(1)C Terminal and Anchor Installation <br /> 44 The first paragraph is revised to read: <br /> 45 <br /> I <br /> i <br />