Laserfiche WebLink
I <br /> 1 All excavation and backfilling required for installation of anchors shall be performed in <br /> 2 accordance with Section 2-09, except that the costs thereof shall be included in the unit <br /> 3 Contract price for the anchor installed. <br /> 4 <br /> 5 The first sentence of the second to last paragraph is revised to read: <br /> 6 <br /> 7 Assembly and installation of Beam Guardrail Non-flared Terminals for Type 31 guardrail <br /> 8 shall be supervised at all times by a manufacturer's representative, or an installer who <br /> 9 has been trained and certified by the manufacturer. <br /> 10 <br /> 11 The last paragraph is revised to read: <br /> 12 <br /> 13 Beam Guardrail Non-flared Terminals for Type 31 guardrail shall meet the crash test and I <br /> 14 evaluation criteria in the Manual for Assessing Safety Hardware (MASH). <br /> 15 <br /> 16 8-11.4 Measurement <br /> 17 The third paragraph is revised to read: <br /> 18 <br /> 19 Measurement of beam guardrail terminal will be per each for the <br /> 20 completed terminal. <br /> 21 <br /> 22 The fourth paragraph is revised to read: <br /> 23 <br /> 24 Measurement of beam guardrail Type 31 buried terminal Type 2 will be per linear foot for <br /> 25 the completed terminal. <br /> 26 <br /> 27 The sixth paragraph is revised to read: <br /> 28 <br /> 29 Measurement of beam guardrail anchor Type 10 will be per each for the completed <br /> 30 anchor, including the attachment of the anchor to the guardrail. <br /> 31 <br /> 32 8-11.5 Payment <br /> 33 The Bid item "Beam Guardrail Anchor Type ", per each is revised to read "Beam Guardrail <br /> 34 Anchor Type 10", per each. <br /> 35 <br /> 36 The Bid item "Beam Guardrail Buried Terminal Type 1", per each is deleted from this section. <br /> 37 <br /> 38 The Bid item "Beam Guardrail Buried Terminal Type 2", per linear foot and the following <br /> 39 paragraph are revised to read: <br /> 40 <br /> 41 "Beam Guardrail Type 31 Buried Terminal Type 2", per linear foot. <br /> 42 <br /> 43 The unit Contract price per linear foot for"Beam Guardrail Type 31 Buried Terminal Type <br /> 44 2" shall be full payment for all costs to obtain and provide materials and perform the Work <br /> 45 as described in Section 8-11.3(1)C. <br /> 46 <br /> t <br /> 1 <br />