Laserfiche WebLink
I <br /> ARTICLE 8 MATERIAL, EQUIPMENT, WORKMANSHIP AND CONSTRUCTION UTILITIES <br /> A. GENERAL <br /> A. Unless otherwise specifically stated in the Contract Documents, the Contractor shall provide and pay for <br /> materials, labor, tools, Equipment, water, light, power, transportation, supervision, and temporary <br /> construction of any nature,and other services and facilities of any nature,whatsoever necessary, to execute, <br /> complete and deliver the Work within the specified time. Contractor shall be liable for all power and water <br /> costs until Substantial Completion, whether such power or water is provided by temporary or permanent <br /> facilities. Owner shall not be liable for any costs or Delays arising out of or caused by the availability or <br /> lack of availability of permanent power or utilities. Material and Equipment shall be new and of the <br /> specified quality. Equipment offered shall be new or current specified models. This requirement does not <br /> apply to minor details, or to thoroughly demonstrated improvements in design or in materials of <br /> construction. Construction Work shall be executed in conformity with the standard practice of the trade. <br /> B. PRODUCT DATA <br /> A. When specified,the Contractor shall provide data required for inspecting,testing, operating, or maintaining <br /> parts of the Work. Unless otherwise specified, such data shall be provided at the time the referenced <br /> material or Equipment is delivered to the job Site. The data shall be as specified and shall include, unless <br /> otherwise specified, such items as shop drawings, erection drawings, reinforcing steel schedules, testing <br /> and adjusting instructions, operations manuals, maintenance procedures, parts lists, and record drawings. <br /> Such data shall be provided as part of the Work under this Contract and its acceptability determined by the <br /> Owner in its sole discretion. <br /> C. QUALITY <br /> A. Where detailed Specifications of materials, Equipment, or construction Work are not set forth, the <br /> Contractor shall perform the Work using materials and Equipment of a quality comparable to the materials <br /> and workmanship specified for the other parts of the Work, from firms of established good reputations, and <br /> shall follow standard practices to perform construction Work of good quality in a workmanlike way. Work <br /> performed shall be in conformity and harmony with the intent to secure the standard of construction and <br /> Equipment of Work as a whole and in part. All Work must comply and conform to applicable building <br /> codes in effect when the Work is performed. <br /> D. MATERIAL AND EQUIPMENT SPECIFIED BY NAME <br /> A_ When material or Equipment is specified by reference to patents, brand names, or catalog numbers, the <br /> Owner will not usually consider or approve a substitution. However,the Contractor may offer substitutions <br /> of products it considers to be equal to that specified,but the Owner is not obliged or required to consider or <br /> accept such offered substitution. <br /> E. REQUESTS FOR SUBSTITUTION <br /> A. See Section 01 25 13. <br /> B. The Contractor may offer material or Equipment of equal or better quality and performance in substitution <br /> for those specified. Only the Contractor may request substitutions. The Contractor's offers of substitution <br /> I shall be made in writing to the Owner's Representative and shall include sufficient data to enable the <br /> Owner's Representative to assess the acceptability of the material or Equipment for the particular <br /> application and requirements. The Owner and Owner's Representative are not required or obligated to <br /> consider or review a request for substitution and may, in their sole discretion and option,consider or review <br /> such requests. <br /> 10023829 City of Everett Public Works July 2018 <br /> WPCF FEN Chlorination Building Upgrade Work Order 3614 <br /> GENERAL CONDITIONS <br /> 00 72 13-31 Issue for Bid <br />