My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc 11/13/2018
>
Contracts
>
Capital Contract
>
IMCO General Construction Inc 11/13/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 10:26:57 AM
Creation date
11/15/2018 10:50:15 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc
Approval Date
11/13/2018
Council Approval Date
10/17/2018
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
WPCF FEN Chlorination Building Upgrade
Public Works WO Number
UP3614
Tracking Number
0001476
Total Compensation
$7,733,718.36
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction 2/18/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction 2/6/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction 3/16/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction Inc 2/25/2025 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction Inc 4/15/2020 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction Inc. 11/4/2020 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> C. If the offered substitution requires changes to or coordination with other portions of the work, the <br /> Contractor shall include with its substitution request any such drawings and details showing such changes. <br /> The Contractor agrees to perform these changes as part of the substitution of material or Equipment at no <br /> additional cost to the Owner. Approval of a substitution request shall not relieve the Contractor from <br /> responsibility for the efficiency, quality, and performance of the substitute material or Equipment, in the <br /> same manner and degree as the material and Equipment originally specified. Any cost differential <br /> associated with a substitution shall be reflected in the offer. If the Owner approves the substitution, the <br /> Contract Documents shall be modified by a Change Order modifying the Contract Sum in the amount of <br /> the cost differential. <br /> F. DEMONSTRATION OF COMPLIANCE WITH CONTRACT REQUIREMENTS <br /> A. Inspection <br /> I. The burden of proving the constructed Work complies with the Contract Documents shall be on the <br /> Contractor at all times. To demonstrate its compliance with the Contract requirements,the Contractor <br /> shall assist the Owner's Representative in his or her inspection and observation of the Work. The <br /> Contractor shall grant the Owner's Representative access to the Work and Work Site, and to places <br /> where Work is being prepared, or where materials, Equipment, or machinery are being obtained for <br /> Work. The Contractor shall provide information requested by the Owner's Representative in <br /> connection with inspection work. <br /> 2. If the Contract Documents, laws, ordinances, or any public regulatory authority requires parts of the <br /> Work to be specially inspected, tested, or approved, the Contractor shall give the Owner's <br /> Representative adequate prior written Notice of the availability of the subject Work for examination, <br /> which Notice shall be not less than two working days. <br /> a. See Section 01 45 33. <br /> 3. Inspection and quality control tests performed on Work by the Contractor by the Owner's <br /> Representative shall not relieve the Contractor of its responsibility for errors or lack of quality therein <br /> and shall not be regarded as an assumption of risks or liability by the Owner's Representative for the <br /> Contractor's compliance with these Contract Documents. Contractor remains responsible and liable <br /> for all errors, defects or a lack of quality not discovered by inspection or observation. <br /> 4. If parts of the Work are covered prior to inspection or observation, the cost of exposing the Work for <br /> inspection and closing and re-covering shall be borne by the Contractor regardless of whether the <br /> Work is found to be in compliance with the Contract. <br /> H. Samples of Materials <br /> 1, The Contractor shall provide Samples or specimens of materials to be incorporated in the Work that <br /> require laboratory examination or special testing, as requested by the Owner's Representative. Such <br /> Samples or specimens shall be provided in ample time to permit making proper test analysis and <br /> examinations before the Contractor plans to incorporate the material into the Work. An independent <br /> testing laboratory will conduct tests of material in accordance with the Specifications. In the absence <br /> of a specific test requirement, the Owner's Representative will determine the appropriate standard test <br /> to be used. <br /> C. Certification <br /> I. In cases where compliance of materials or Equipment to Contract requirements is not readily <br /> determinable through inspection and tests, the Contractor shall provide properly authenticated <br /> documents, certificates, or other proof satisfactory to the Owner's Representative that the materials <br /> and Equipment comply with the Contract requirements. These documents, certifications, and proofs <br /> shall include performance characteristics, construction materials, and physical or chemical <br /> characteristics of materials. The Contractor shall pay all associated costs of such certification. <br /> D. Inspection at Point of Manufacturing <br /> 10023829 City of Everett Public Works July 2018 <br /> WPCF FEN Chlorination Building Upgrade Work Order 3614 <br /> GENERAL CONDITIONS <br /> 00 72 13-32 Issue for Bid I <br />
The URL can be used to link to this page
Your browser does not support the video tag.