My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction Inc 11/13/2018
>
Contracts
>
Capital Contract
>
IMCO General Construction Inc 11/13/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2025 10:26:57 AM
Creation date
11/15/2018 10:50:15 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction Inc
Approval Date
11/13/2018
Council Approval Date
10/17/2018
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
WPCF FEN Chlorination Building Upgrade
Public Works WO Number
UP3614
Tracking Number
0001476
Total Compensation
$7,733,718.36
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
IMCO General Construction 2/18/2020 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction 2/6/2020 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction 3/16/2020 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction Inc 2/25/2025 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
IMCO General Construction Inc 4/15/2020 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
IMCO General Construction Inc. 11/4/2020 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1413
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> C. Verbal answers are not binding on any party. <br /> D. Submit questions not less than seven days before date set for receipt of Bids. <br /> E. Addenda: <br /> 1. Replies will be made by Addenda,which may be issued during Bidding period. I <br /> 2. Addenda will be published online on Washington Builders Exchange website. <br /> 3. Addenda become part of Contract Documents. I <br /> F. Include resultant costs in Bid Sum. <br /> 1.12 PRODUCT SUBSTITUTIONS <br /> A. Requests for product substitutions will not be accepted before execution of Contract; refer to Section 01 <br /> 25 13 -Product Substitutions. <br /> B. Changes in the Work: I <br /> 1. In submitting substitutions to specified products, Bidders shall include changes required in the <br /> Work and changes to Contract Time, Contract Sum, and to accommodate such approved <br /> substitutions in their Bid. <br /> 2. Later claims by the Bidder for an addition to the Contract Time or Contract Sum because of <br /> changes in Work necessitated by use of substitutions will not be considered. <br /> C. Approval to submit substitution requests prior to submission of Bids is not required. <br /> I <br /> 1.13 SUBMISSION PROCEDURE <br /> A. Bidders shall be solely responsible for delivery of Bids in manner and time prescribed. I <br /> B. Submit one copy of executed offer on provided Bid Forms found in the Contract Documents, signed and <br /> sealed with required security deposit in a closed opaque envelope, and clearly identified with Bidder's <br /> name and address,Project name and number, and Owner's name on outside. <br /> C. The submission of a Bid by the Bidder shall constitute acknowledgment that, in preparing and submitting <br /> a Bid, Bidder has not only reviewed the Contract Documents, Bidder is also relying on their own <br /> knowledge,examination, inspection, and testing of: <br /> 1. the Site of the Work, <br /> 2. access to the Site, <br /> 3. environmental factors, <br /> 4. all other data,matters and things requisite to the fulfillment of the Work, I <br /> 5. conditions ordinarily to be encountered and generally recognized as inherent in the Work, <br /> 6. available services and utilities at and in the vicinity of the Site of the Work, and I <br /> 10023829 City of Everett Public Works July 2018 <br /> WPCF FEN Chlorination Building Upgrade Work Order 3614 <br /> INSTRUCTIONS TO BIDDERS <br /> 00 21 13-4 Issue for Bid <br />
The URL can be used to link to this page
Your browser does not support the video tag.