Laserfiche WebLink
I <br /> 1 1 <br /> 2 The Contractor shall submit a breakdown of the cost of lump sum bid items at the <br /> 3 Preconstruction Conference, to enable the Project Engineer to determine the Work <br /> 4 performed on a monthly basis. A breakdown is not required for lump sum items that include <br /> 5 a basis for incremental payments as part of the respective Specification. Absent a lump <br /> 6 sum breakdown, the Project Engineer will make a determination based on information <br /> 7 available. The Project Engineer's determination of the cost of work shall be final. <br /> 8 <br /> 9 Progress payments for completed work and material on hand will be based upon progress <br /> I <br /> 10 estimates prepared by the Engineer. A progress estimate cutoff date will be established at <br /> 11 the preconstruction conference. <br /> 12 1 <br /> 13 The initial progress estimate will be made not later than 30 days after the Contractor <br /> 14 commences the work, and successive progress estimates will be made every month <br /> 15 thereafter until the Completion Date. Progress estimates made during progress of the work I <br /> 16 are tentative, and made only for the purpose of determining progress payments. The <br /> 17 progress estimates are subject to change at any time prior to the calculation of the final <br /> 18 payment. <br /> 19 111 <br /> 20 The value of the progress estimate will be the sum of the following: <br /> 21 1. Unit Price Items in the Bid Form —the approximate quantity of acceptable units of <br /> I <br /> 22 work completed multiplied by the unit price. <br /> 23 2. Lump Sum Items in the Bid Form — based on the approved Contractor's lump sum <br /> I <br /> 24 breakdown for that item, or absent such a breakdown, based on the Engineer's <br /> 25 determination. <br /> 26 3. Materials on Hand — 100 percent of invoiced cost of material delivered to Job site or <br /> 27 other storage area approved by the Engineer. I <br /> 28 4. Change Orders—entitlement for roved extra cost or completed extra work as <br /> PP P <br /> 29 determined by the Engineer. <br /> 30 <br /> I <br /> 31 Progress payments will be made in accordance with the progress estimate less: <br /> 32 1. Retainage per Section 1-09.9(1), on non FHWA-funded projects; <br /> 33 2. The amount of progress payments previously made; and <br /> 34 3. Funds withheld by the Contracting Agency for disbursement in accordance with the <br /> 35 Contract Documents. <br /> 36 <br /> 37 Progress payments for work performed shall not be evidence of acceptable performance or <br /> 38 an admission by the Contracting Agency that any work has been satisfactorily completed. <br /> I <br /> 39 The determination of payments under the contract will be final in accordance with Section <br /> 40 1-05.1. <br /> 41 �42 <br /> 43 1-09.9 (1) Retainage <br /> 44 it 1 <br /> 45 Section 1-09.9(1) content and title is deleted and replaced with the following: ll <br /> 46 <br /> 47 (June 27, 2011 WSDOT GSP) <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 67 OF 117 August 2018 <br /> WORK ORDER#3588 <br /> SPECIAL PROVISIONS <br /> I <br />