My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction Inc 11/20/2018
>
Contracts
>
Capital Contract
>
KLB Construction Inc 11/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:44:01 AM
Creation date
11/29/2018 10:44:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction Inc
Approval Date
11/20/2018
Council Approval Date
10/24/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Wes Marine View Drive Utilities
Public Works WO Number
UP3588
Tracking Number
0001487
Total Compensation
$1,379,227.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB CONSTRUCTION INC. 6/12/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
783
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 11 <br /> 2 Vacant <br /> I4 <br /> 35 <br /> I6 <br /> 7 1-09.11(3) Time Limitation and Jurisdiction <br /> 8 (July 23, 2015 APWA GSP) <br /> I9 <br /> 10 Revise this section to read: <br /> 11 <br /> 12 For the convenience of the parties to the Contract it is mutually agreed by the parties that any <br /> I13 claims or causes of action which the Contractor has against the Contracting Agency arising <br /> 14 from the Contract shall be brought within 180 calendar days from the date of final acceptance <br /> 15 (Section 1-05.12) of the Contract by the Contracting Agency; and it is further agreed that any <br /> I16 such claims or causes of action shall be brought only in the Superior Court of the county <br /> 17 where the Contracting Agency headquarters is located, provided that where an action is <br /> 18 asserted against a county, RCW 36.01.05 shall control venue and jurisdiction. The parties <br /> I19 understand and agree that the Contractor's failure to bring suit within the time period provided, <br /> 20 shall be a complete bar to any such claims or causes of action. It is further mutually agreed <br /> 21 by the parties that when any claims or causes of action which the Contractor asserts against <br /> 22 the Contracting Agency arising from the Contract are filed with the Contracting Agency or <br /> 23 initiated in court, the Contractor shall permit the Contracting Agency to have timely access to <br /> 24 any records deemed necessary by the Contracting Agency to assist in evaluating the claims <br /> I25 or action. <br /> 26 <br /> 27 <br /> 28 1-10 TEMPORARY TRAFFIC CONTROL <br /> 1 29 <br /> 30 <br /> 31 1-10.2 Traffic Control Management <br /> 1 32 Section 1-10.2 is supplemented with the following: <br /> 33 <br /> 34 <br /> I35 A Temporary Traffic Control (TTC) plan for closure of three lanes along West Marine View <br /> 36 Drive (WMVD) is provided in the contract plans. It is expected that this lane closure <br /> 37 configuration may exist for much of the pipe installation along WMVD. The provided TTC <br /> 1 38 plans along WMVD may require some modifications based on information provided in these <br /> 39 provisions, and requests from the Port of Everett due to on-going construction projects in the <br /> 40 Port, or changes in the Port's access needs. All TTC plans to be implemented during <br /> I41 construction, including schedules and durations of the TTC, must be submitted to the <br /> 42 engineer for final approval prior to implementation, including use of the plans provided in the <br /> 43 contract documents. <br /> I44 <br /> 45 The Contracting Agency's anticipated project specific Standard Temporary Traffic Control <br /> 46 plans are provided as guidelines in Appendix A of these Special Provisions. Final TTC plans <br /> 47 submitted for approval must account for impacts to vehicle and pedestrian access through <br /> I48 and around the construction zones on West Marine View Drive, including maintenance of <br /> 49 ADA access along the west side of WMVD. Construction may not begin until the TTC plans <br /> 50 are approved and implemented. <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 68 OF 117 August 2018 <br /> WORK ORDER#3588 <br /> SPECIAL PROVISIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.