My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction Inc 11/20/2018
>
Contracts
>
Capital Contract
>
KLB Construction Inc 11/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2019 10:44:01 AM
Creation date
11/29/2018 10:44:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction Inc
Approval Date
11/20/2018
Council Approval Date
10/24/2018
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Wes Marine View Drive Utilities
Public Works WO Number
UP3588
Tracking Number
0001487
Total Compensation
$1,379,227.25
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
KLB CONSTRUCTION INC. 6/12/2019 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
783
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 I <br /> 2 See also Section 1-07.23 (Public Convenience and Safety) of the project specifications for <br /> 3 lane closure requirements and additional temporary traffic control requirements. <br /> 4 <br /> 5 1-10.2(1) General <br /> 6 <br /> 7 I <br /> 8 (January 3, 2017 WSDOT GSP) <br /> 9 <br /> 10 Only training with WSDOT TCS card and WSDOT training curriculum is recognized in the <br /> 11 State of Washington. The Traffic Control Supervisor shall be certified by one of the following: <br /> 12 I 13 The Northwest Laborers-Employers Training Trust <br /> 14 27055 Ohio Ave. <br /> 15 Kingston, WA 98346 <br /> 1 <br /> 16 (360) 297-3035 <br /> 17 <br /> 18 Evergreen Safety Council <br /> 19 12545 135th Ave. NE <br /> I <br /> 20 Kirkland, WA 98034-8709 <br /> 21 1-800-521-0778 <br /> 22 <br /> 23 The American Traffic Safety Services Association <br /> 24 15 Riverside Parkway, Suite 100 <br /> 25 Fredericksburg, Virginia 22406-1022 <br /> 26 Training Dept. Toll Free (877) 642-4637 <br /> 27 Phone: (540) 368-1701 <br /> 28 <br /> 29 <br /> 30 <br /> 31 1-10.3 Traffic Control Labor, Procedures and Devices <br /> 32 <br /> 33 1-10.3(2)Traffic Control Procedures <br /> 34 Section 1-10.3(2) is supplemented with the following: <br /> 35 1 <br /> 36 <br /> (.....) <br /> 37 Upon failure of the Contractor to immediately provide flaggers, erect, maintain, and <br /> 38 remove signs; or provide, erect, maintain, and remove other traffic control devices when <br /> 39 ordered to do so by the Engineer, the Contracting Agency may without further notice to <br /> 40 the Contractor or the surety, perform any of the above and deduct all or the costs from <br /> 41 the Contractor's payments. The Contractor shall be responsible for providing adequate I <br /> 42 flaggers, signs, and other traffic control devices for the protection of the worker and the <br /> 43 public at all times regardless of whether or not the flaggers, signs, and other traffic <br /> 44 control devices are ordered by the Engineer, or paid for by the Contracting Agency. The I <br /> 45 Contractor shall be liable for injuries and damages to persons and property suffered by <br /> 46 reason of the Contractor's operations or any negligence in connection therewith. <br /> 47 I 48 <br /> 49 Section 1-10.3 is supplemented with the following: <br /> 50 <br /> WEST MARINE VIEW DRIVE UTILITIES PAGE 69 OF 117 August 2018111 <br /> WORK ORDER#3588 <br /> SPECIAL PROVISIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.